Story County, IA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Zoning/building permit needed before construction (§92.10)
First inspection
Foundation location inspection before construction begins
Second inspection
Final inspection required after construction completes
Enforcing dept
Story County Planning and Development Department
Permit expiration
Preliminary permit voids after 6 months if unstarted
Construction deadline
Must finish within 18 months of preliminary permit

Summary

Before any building or structure can be moved, erected, or expanded in unincorporated Story County, it needs a zoning permit, and County Code Section 92.10 requires two inspections: a foundation location inspection before construction begins and a final inspection once construction is complete, both reviewed by the Planning and Development Department.

These county ordinances apply to unincorporated areas of Story County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

92.10 REQUIRED PERMITS. ... Land shall not be occupied or used, and no building or structure shall hereafter be moved, erected or increased in size and occupied or used in whole or in part for any purpose until all required permits are acquired. ... ... 3. Required Inspections. A. All work for which a zoning permit is required shall be subject to a foundation location inspection prior to construction to ensure conformance to all zoning requirements, floodplain regulations, platting and other requirements. B. A final inspection shall also be completed after all construction has been finished in order to ensure conformance to all zoning requirements, floodplain regulations, erosion and sediment control requirements, platting, and other requirements.

Full Breakdown

10 of the Land Development Regulations governs required permits and inspections for construction in unincorporated Story County. No land may be occupied or used, and no building or structure may be moved, erected, or increased in size and occupied or used, until all required permits are acquired. 08, including Conditional Use, Zoning, Home Business, Grading, Change of Use, Sign, and Special Events permits, and every application is reviewed for conformance with zoning requirements, floodplain regulations, platting and other standards; if the project involves wastewater generation, the Story County Environmental Health Department must review and approve it before a zoning permit can issue.

Construction proceeds in two permit stages. A preliminary zoning permit is issued after an initial review confirms the plans meet applicable requirements, allowing construction to begin. Two required inspections bracket the build: a foundation location inspection before construction starts, confirming the foundation conforms to zoning, floodplain, platting and other requirements, and a final inspection after all construction is finished, checking conformance with zoning, floodplain, erosion and sediment control, platting and other requirements. Only after that final inspection does the county issue the final permit. A preliminary permit expires six months after issuance if construction has not started, though the Director can grant a one-time six-month extension on written request; once construction begins, it must be completed within 18 months of the preliminary permit's issuance or extension.

Violations & Fines

The Planning and Development Director enforces permit and inspection requirements under Chapter 92 and can order discontinuance of any illegal use, removal of illegal structures, or a halt to work proceeding without required approvals. Occupying or changing the use of a building before its permits and inspections are complete exposes the property to enforcement as a Planning and Development infraction under Chapter 93.

Frequently Asked Questions

What inspections does Story County require during construction?
Section 92.10 requires two inspections for any project needing a zoning permit: a foundation location inspection before construction begins to confirm the foundation meets zoning, floodplain and platting rules, and a final inspection after construction is finished, before Planning and Development issues the final permit.
How long is a Story County zoning permit good for?
A preliminary zoning permit expires six months after issuance if construction hasn't started, though the Director can grant one six-month extension on written request. Once work begins, construction must be completed within 18 months of the preliminary permit's issuance or extension, per Section 92.10(4).
Does Story County review wastewater before issuing a building permit?
Yes. Under Section 92.10(2), if a proposed project involves wastewater generation, the Story County Environmental Health Department must review and approve the wastewater system before a zoning permit can be issued, in addition to the standard zoning, floodplain and platting review every application receives.

Sources & Official References

Other rules in Story County

All Story County rules

Compare Story County to another location·View the Iowa building safety overview

Get notified when Building Inspections in Story County, IA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.