Terrebonne Parish, LA Building Safety: Building Inspections (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Terrebonne Parish Code, Ch. 6, App. A § 110
Required stages
Ten inspections, §§ 110.3.1-110.3.10
First stage
Footing, foundation and plumbing rough-in
Last stage
Final inspection of all building trades
Re-inspection fee
$75 per additional visit

Summary

Terrebonne Parish requires construction to stay accessible for inspection until the Building Official approves it, and Section 110.3 lists ten required inspection stages, from footing and foundation through the final inspection, that a permit holder must schedule before work can be covered or occupied.

These county ordinances apply to unincorporated areas of Terrebonne Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

110.1 General. ... Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. ... 110.3 Required Inspections. The building official, upon notification, shall make the inspections set forth in Sections 110.3.1 through 110.3.10. ... 110.3.1 ... 0 Final Inspection. The final inspection shall be made after all work required by the building permit is completed and shall include final inspection of the work required to be completed in each of the building trades disciplines.

Full Breakdown

Section 110 of the Terrebonne Parish Consolidated Building Code governs how permitted construction is inspected. 1, any work for which a permit is required must remain accessible and exposed for inspection until the Building Official approves it, and an inspection approval never authorizes work that otherwise violates the code or other parish ordinances. 2 lets the Building Official make a preliminary inspection of the site. 10: footing, foundation and plumbing rough-in; concrete slab and under-floor; lowest floor elevation in flood hazard areas; framing and masonry; lath and gypsum board; fire and smoke-resistant penetrations; other inspections the Building Official deems necessary; special inspections under the International Building Code; and a final inspection covering every building trade discipline once all permitted work is complete.

1 requires an elevation certificate to be submitted before final inspection for any structure in a flood hazard area. 5 to notify the Building Official when work is ready for each inspection and to provide access for it. 6, work may not proceed beyond the point covered by a passed inspection until the Building Official gives approval, and any part that fails must be corrected and left uncovered until it is re-inspected and authorized. Additional or re-inspection visits cost $75 under the Section 109 fee schedule.

Violations & Fines

Covering or concealing work before it passes the required inspection under § 110.3, or proceeding past a failed inspection point without correction, violates § 110.6. The Building Official can order the work re-exposed for inspection at the permit holder's expense, and each additional inspection or re-inspection costs $75 under the Section 109 fee schedule.

Frequently Asked Questions

What inspections does Terrebonne Parish require during construction?
Section 110.3 lists ten stages: footing/foundation/plumbing rough-in, concrete slab or under-floor, lowest floor elevation in flood zones, framing and masonry, lath and gypsum board, fire and smoke-resistant penetrations, other inspections the Building Official requires, special inspections, and a final inspection covering every trade once work is complete.
Can I cover up framing before it's inspected?
No. Section 110.1 requires the work to remain accessible and exposed for inspection until the Building Official approves it, and § 110.6 bars proceeding beyond an inspection point without approval; anything that fails must stay uncovered until corrected and re-inspected.
How much does a re-inspection cost in Terrebonne Parish?
An additional inspection or re-inspection visit costs $75, listed as its own line item on the commercial, trade, residential and miscellaneous permit fee tables under Section 109. The Building Official can require it any time work fails to pass its scheduled inspection stage.

Sources & Official References

Other rules in Terrebonne Parish

All Terrebonne Parish rules

Compare Terrebonne Parish to another location·View the Louisiana building safety overview

Get notified when Building Inspections in Terrebonne Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.