Skip to main content
CityRuleLookup

Birmingham, AL Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Adopted code
International Plumbing Code, 2015 Edition
Permit required
Sec. 7-1-3 § 103, before plumbing work
Underground inspection
Before backfill (§105.9.1)
Sewer test acceptance
Jefferson County Environmental Services (§105.9.8)
Master plumber notice
48 hours before final inspection (§105.9.4)
Late-start penalty
Permit fee doubled (§104.2)
General penalty
Up to $500 fine or 6 months jail (§1-1-6)

Summary

Birmingham enforces the International Plumbing Code, 2015 Edition, for every plumbing installation in the city, adopted at Sec. 7-1-2(c) of the Technical Code. A permit from the Building Official is required before any plumbing work begins, and the master plumber must schedule underground, rough-in, and final inspections in sequence under Section 105.9.

(c)Plumbing. The provisions of the International Plumbing Code, 2015 Edition, published by International Code Council shall apply to every plumbing installation, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and/or appurtenances within the city. ... 105.9.1. Underground Inspection. To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. 105.9.2. Rough-In Inspection. To be made after the roof, framing, fireblocking and bracing is in place and all soil, waste and vent piping is complete, and prior to this installation of wall or ceiling membranes. 105.9.3 Final Inspection. To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. ... 105.9.4 Responsibility of Master Plumber. It shall be the responsibility of the master plumber to notify the office of the Building Official within forty-eight hours after the completion of the job and before the plumbing system, alterations or additions are placed in service, that the work is ready for final inspection.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 3).

Full Breakdown

The Technical Code of the City of Birmingham, 2015 (adopted by Ord. No. 15-164, amended by Ord. No. 16-88) adopts the International Plumbing Code, 2015 Edition, published by the International Code Council, for every plumbing installation in the city, including alterations, repairs, replacements, equipment, appliances, fixtures, fittings and appurtenances (Sec. 7-1-2(c)). The only listed exception is a boiler or pressure vessel already subject to inspection by federal or state inspectors. Chapter 1, Administration (Sec. 1 requires the owner, agent or contractor to apply and secure the permit before work starts.

3). 8). 4 makes the master plumber responsible for notifying the Building Official within forty-eight hours after the job is complete and before the system is placed in service that the work is ready for final inspection.

Violations & Fines

Installing or altering plumbing without the required permit violates Sec. 7-1-3, Section 103. If work starts before the permit is issued, Section 104.2 doubles the fee, with an added $50.00 penalty for each repeat violation within twelve months. The Building Official may withhold further permits until earlier violations are corrected, and any Technical Code violation is punishable under the city's general penalty, Sec. 1-1-6, by a fine up to $500.00 or up to six months in the city jail, with each day of a continuing violation a separate offense.

Frequently Asked Questions

What plumbing code does Birmingham use?
Birmingham adopted the International Plumbing Code, 2015 Edition, published by the International Code Council, under Sec. 7-1-2(c) of the Technical Code of the City of Birmingham, 2015; it governs every plumbing installation, alteration, repair and fixture replacement in the city.
Do I need a permit before starting plumbing work?
Yes. Sec. 7-1-3, Section 103 makes it unlawful to install, alter or repair a plumbing system without a permit from the Building Official, and Section 103.1.1 requires the owner, agent or contractor to file an application and obtain the permit before the work begins.
What inspections happen during a plumbing job?
Section 105.9 requires an underground inspection before backfill, a rough-in inspection after framing and before walls close up, and a final inspection once fixtures are connected and the building is ready for occupancy; the water-supply system is also pressure-tested under Section 105.9.7.
Who has to call for the final plumbing inspection?
Section 105.9.4 makes the master plumber responsible for notifying the Building Official within forty-eight hours after the job is finished and before the system is used, so the Building Official can confirm the work passed final inspection.

Sources & Official References

Other rules in Birmingham

All Birmingham rules

Compare Birmingham to another location·View the Alabama building safety overview

Get notified when Plumbing Permits in Birmingham, AL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Jefferson County handle plumbing permits.

Hoover, AL
Some Restrictions
Vestavia Hills, AL
Some Restrictions