Skip to main content
CityRuleLookup

Jacksonville, NC Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Plumbing code
Current NC Plumbing Code, adopted by reference (§ 5-115)
Sewer/water connection
Permit/authorization required (§ 5-118)
Permit revocable
Anytime before completion for improper work (§ 5-119)
Damage liability
Plumber restores street, liable for damage (§ 5-120)
Fees
Set by city council, filed with city clerk (§ 5-20)

Summary

The City of Jacksonville, North Carolina adopts the North Carolina Plumbing Code by reference as its plumbing code under City Code § 5-115, and no plumber or other person may connect to the public sewer without being authorized under § 5-118. Work permit and inspection fees are set by the city council and filed with the city clerk and building inspection department under § 5-20.

The fees for the various work permits and inspections required by the provisions of this chapter shall be as determined by the city council from time to time and on file in the offices of the city clerk and building inspection department. ... The most recent edition of the North Carolina ... Plumbing Code, as adopted and published by the North Carolina Building Code Council and as amended, is hereby adopted by reference as fully as though set forth herein as the plumbing code for the city. ... No plumber or any other person shall make a connection to the public sewer without being duly told to do so, nor in any manner except in strict accordance with this chapter.

Full Breakdown

Jacksonville, North Carolina does not write its own plumbing code; instead § 5-115 adopts by reference the most recent edition of the North Carolina Plumbing Code as published by the North Carolina Building Code Council, along with its amendments, as the city's plumbing code, and § 5-116 makes state amendments effective locally as soon as they are filed with the city clerk. Official copies of the code and every amendment are kept on file in the city clerk's office under § 5-117, and the Appendix to the state plumbing code is separately adopted under § 5-121 for design, construction methods and material standards.

Before any plumber or other person connects a building to the public water or sewer system, § 5-118 requires that the person be duly authorized to do so and act in strict accordance with the chapter, which functions as the city's sewer-tap permit requirement, enforced through the building inspection department referenced in § 5-20. Section 5-119 conditions every water or sewer connection permit on proper execution of the work, and lets the mayor and city council revoke or annul the permit at any time before completion if the work is not being properly done, with no right to damages for the plumber if that happens.

Section 5-120 makes the plumber who taps into the public water or sewer personally responsible for any damage caused to the sewer or street, and requires the plumber to restore the street to the condition it was in before work began. Permit and inspection fees for this and other chapter 5 work are set by the city council from time to time and kept on file with the city clerk and the building inspection department under § 5-20, rather than being fixed in the ordinance text itself.

Violations & Fines

Connecting to the public sewer without authorization, or performing work outside strict compliance with Chapter 5's plumbing provisions, violates § 5-118. The city can revoke or annul a water or sewer connection permit at any time before completion under § 5-119 if the work is not properly executed, leaving the plumber with no claim for damages. Under § 5-120, the plumber is held financially responsible for any damage done to the sewer or street and must restore the street to its prior condition.

Frequently Asked Questions

What plumbing code applies in Jacksonville, North Carolina?
The city does not maintain its own plumbing code text. Under City Code § 5-115, it adopts by reference the most recent edition of the North Carolina Plumbing Code, as published and amended by the North Carolina Building Code Council, and § 5-116 makes each state amendment effective locally as soon as it is filed with the city clerk.
Do I need a permit to connect to the city sewer?
Yes. Section 5-118 makes it unlawful for a plumber or anyone else to connect to the public sewer without being duly authorized to do so and without following the chapter's requirements exactly, so an unauthorized tap is a code violation even if the plumbing itself is done correctly.
Can the city cancel my sewer connection permit mid-job?
Yes. Under § 5-119, every permit to connect to public water or sewer is issued on the condition that the mayor and city council may revoke or annul it at any time before completion if the work is not being properly executed, and the permit holder has no claim for damages if that happens.
Who pays if a sewer connection damages the street?
The plumber does. Section 5-120 holds the plumber who makes the house connection responsible for any damage caused to the sewer or street during the work and requires the plumber to restore the street to as good a condition as it was before the work began.

Sources & Official References

Other rules in Jacksonville

All Jacksonville rules

Compare Jacksonville to another location·View the North Carolina building safety overview

Get notified when Plumbing Permits in Jacksonville, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.