Peoria, IL Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing plumbing code
Current State of Illinois Plumbing Code
Permit required
Yes, before installation/alteration (Sec. 5-91)
Residential permit fee
0.008 x construction cost ($5,000+ jobs)
Commercial permit fee
0.009 first $5M, 0.002 over $5M
Permit expiration
6 months to start, 12 months to finish
1st unpermitted-work fine
Not less than $100

Summary

Peoria adopts the current State of Illinois Plumbing Code for all plumbing design and installation under Sec. 5-122's amendment to Chapter 29 of the International Building Code. Any plumbing work regulated by the code requires a permit under Sec. 5-91 first, with fees set by construction value under Sec. 5-97.

Chapter 29, Plumbing Systems, is hereby deleted in its entirety and the following inserted in lieu thereof: Chapter 29, Plumbing Systems. The current State of Illinois Plumbing Code shall be followed for all design and installation of plumbing systems, including sanitary and storm drainage, sanitary facilities, water supply and stormwater and sewage disposal in buildings. Sec. 5-91. - Required; expiration. (a)It shall be unlawful to construct, enlarge, alter or demolish a structure...or to install or alter any equipment for which provision is made or the installation of which is regulated by this Code, without first filing an application with the code official in writing and obtaining the required permit therefor; except that ordinary repairs which do not involve any violation of this Code shall be exempt from this section.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 119).

Full Breakdown

Sec. 5-122 amends the adopted International Building Code by deleting its Chapter 29, Plumbing Systems, and replacing it: the current State of Illinois Plumbing Code governs the design and installation of all plumbing systems in the city, including sanitary and storm drainage, sanitary facilities, water supply, and stormwater and sewage disposal in buildings. Sec. 5-91(a) then makes it unlawful to install or alter any equipment regulated by the code, which covers plumbing fixtures and systems, without first filing a written application with the code official and obtaining a permit, exempting only ordinary repairs that don't violate the code.

A permit becomes void if work doesn't start within six months or finish within 12 months of issuance, requiring a new permit and new fees under Sec. 5-91(b). Sec. 002 on value above that; a straight demolition permit runs a flat $50. Starting plumbing or any other regulated work before pulling the permit triples the fee under Sec. 5-97(a), though bona fide emergency work is exempt as long as the permit is obtained within two business days. Sec. 5-41 separately requires the city manager to always employ at least one plumbing inspector who is a state-licensed plumber, and Sec.

5-27(a) backs the whole permit requirement with escalating fines of not less than $100 for a first offense, $300 for a second, and $500 for a third or subsequent offense within two years, plus a 12-month bar on pulling any city permits after a third violation.

Violations & Fines

Doing plumbing work without first obtaining the required permit is a violation of Sec. 5-27(a), carrying a fine of not less than $100 for a first offense, $300 for a second, and $500 for a third or later offense within a two-year period. A person or entity cited more than three times in two years loses permit privileges in Peoria for 12 months and forfeits any contractor license, and reinstatement afterward requires a $200 fee plus a clean account with the city. Starting work before the permit issues also triples the standard permit fee under Sec. 5-97(a).

Frequently Asked Questions

What plumbing code does Peoria enforce?
Sec. 5-122 replaces Chapter 29 of the adopted International Building Code with the current State of Illinois Plumbing Code, which governs sanitary and storm drainage, sanitary facilities, water supply, and sewage disposal design and installation citywide.
Do I need a permit before starting plumbing work in Peoria?
Yes. Sec. 5-91(a) requires a written application and permit from the code official before installing or altering any plumbing equipment regulated by the code, except ordinary repairs that don't violate it.
What happens if I start plumbing work without a permit?
Sec. 5-27(a) sets fines of not less than $100 for a first offense, $300 for a second, and $500 for a third within two years, and a third violation blocks you from pulling any city permits for 12 months.
How much does a residential plumbing permit cost in Peoria?
Sec. 5-97(a) sets the fee at 0.008 times the construction cost for residential jobs valued at $5,000 or more; starting work before the permit issues triples that fee.

Sources & Official References

Other rules in Peoria

All Peoria rules

Compare Peoria to another location·View the Illinois building safety overview

Get notified when Plumbing Permits in Peoria, IL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.