Bulloch County, GA Building Setbacks & Zoning: Lot Coverage Limits (2026)
Key Facts
- Max lot coverage, HC district
- 80 percent
- GC/NC/LI/HI lot coverage
- No figure printed in table
- HC front-yard setback
- 35 feet
- HC max habitable height
- 45 feet
- Density bonus available
- 15% with amenities (Sec. 1212-1213)
Summary
Bulloch County's zoning development standards cap maximum lot coverage at 80 percent in the Highway Commercial district; the same Section 806 table leaves lot coverage unlisted for General Commercial, Neighborhood Commercial, Light Industrial and Heavy Industrial.
Section 806. - Development standards. Requirements HC GC NC LI HI ... Lot Coverage (Maximum) 80%
Full Breakdown
Section 806 of the Zoning Ordinance (Appendix C, Article 8) is the development standards table for the county's commercial and industrial districts: Highway Commercial (HC), General Commercial (GC), Neighborhood Commercial (NC), Light Industrial (LI) and Heavy Industrial (HI). Under the row labeled \"Lot Coverage (Maximum)\" the table prints a single value, 80 percent, in the HC column, with the GC, NC, LI and HI columns left blank in the printed table, meaning the ordinance imposes its explicit maximum lot coverage limit specifically on the Highway Commercial district.
That figure sits in the same table as the district's other dimensional standards: HC also carries a 100-foot minimum lot width, a 35-foot front-yard setback, a 15-foot interior side setback, a 15-foot rear setback, and a 45-foot maximum habitable building height. The Section 806 general provisions clarify that open space required by the ordinance, including any area counted against the lot-coverage limit, may not be encroached upon except in conformity with the yard, setback, and other development standards, and that shrubbery, driveways, retaining walls, fences, curbs and buffers are not counted as encroachments.
The building and zoning official may authorize a 15 percent bonus incentive for increased floor area ratio or net density where a development meets performance standards and offers amenities under Sections 1212 and 1213. Bulloch County's residential development standards table at Section 606 does not include a lot-coverage row at all, so the 80 percent HC figure is the ordinance's only explicit numeric lot-coverage ceiling.
Violations & Fines
Covering more than 80 percent of a Highway Commercial lot with buildings and impervious structures, counted per Section 806, violates the district's development standards. Zoning Ordinance violations are punished under Section 418 per Bulloch County Code Sec. 1-11: a fine up to $1,000.00, up to 60 days in jail, or both, with each day a separate offense.
Frequently Asked Questions
Is there a maximum lot coverage limit in Bulloch County?
Does the residential zoning table set a lot coverage percentage?
Can I get a density bonus above the standard lot coverage in Bulloch County?
What counts as an encroachment against Bulloch County's open space standards?
Sources & Official References
Other rules in Bulloch County
Compare Bulloch County to another location·View the Georgia building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.