Bulloch County, GA Parking Rules: Loading Zones (2026)
Key Facts
- Governs
- Manufacturing, industrial, wholesale, retail uses
- Sizing standard
- Appropriate to scope of operation
- Maneuvering
- Must stay within property lines
- Max driveway width
- 35 feet at right-of-way line
- Max curb cut width
- 50 feet
Summary
Unincorporated Bulloch County requires manufacturing, industrial, wholesale and retail operations to provide off-street loading space sized to their operations, designed so loading maneuvers stay entirely on-site, and served by driveways that meet the county's curb-cut standards under Appendix G of the code.
Section 104. - Number of loading spaces required.Manufacturing, industrial, wholesale and retail operations must provide loading space as follows:(1)Spaces appropriate to functions: Offstreet loading spaces must be provided as appropriate to the functions and scope of operation or individual or groups of buildings and uses.(2)Design of loading spaces: Offstreet loading spaces must be designed and constructed so that all maneuvering to park vehicles for loading can take place entirely within the property lines of the premises. Loading spaces must be provided so as not to interfere with the free, normal movement of vehicles and pedestrians on public rights-of-way.(3)Ingress and egress: Ingress and egress to offstreet loading spaces must conform to curb cut requirements specified in this standard.
Full Breakdown
Bulloch County Appendix G, the county's off-street parking and service facilities standard, sets the loading-space rule in Section 104 for unincorporated Bulloch County. Any manufacturing, industrial, wholesale or retail operation must provide off-street loading space, but the standard does not fix a single number of spaces for every use; instead, Section 104(1) requires loading space appropriate to the functions and scope of operation of the individual building or use, with Section 101 tying the standard back to the requirements specified by use in the county's zoning resolution.
Design matters as much as quantity: Section 104(2) requires that loading spaces be designed and constructed so that all vehicle maneuvering to park for loading happens entirely within the property lines of the site, and the spaces cannot be laid out in a way that interferes with the free, normal movement of vehicles and pedestrians on the public right-of-way outside. Getting trucks to and from those loading spaces is governed by the county's curb-cut rules in Section 105, which cap driveway width at 35 feet at the right-of-way line, cap the curb cut itself (including the curb-return radii) at 50 feet, and require curb cuts to sit at least 25 feet from a street intersection's curb lines or 15 feet from the intersecting property lines, whichever distance is less.
Violations & Fines
A site that lacks the loading space its operation requires, that lets loading maneuvers spill into the public right-of-way, or whose driveway or curb cut exceeds Appendix G's width and spacing limits is out of compliance with the standard enforced through the county's building and zoning permit process, and the zoning administrator can withhold a certificate of occupancy or permit approval until the loading and curb-cut design is corrected.
Frequently Asked Questions
Does Bulloch County set a fixed number of loading spaces per business?
Can loading trucks back into the street in unincorporated Bulloch County?
How wide can a commercial driveway be in unincorporated Bulloch County?
Sources & Official References
Other rules in Bulloch County
Compare Bulloch County to another location·View the Georgia parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.