Skip to main content
CityRuleLookup

Clovis, CA Building Setbacks & Zoning: Lot Coverage Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

R-1 / R-1-C max coverage
40%
R-1-A / R-1-AH / R-R / R-A max
30%
R-1-B max coverage
35%
Director bonus coverage
up to 45%
Cottage home program (PA7)
up to 50%
Governing table
Development Code Table 2-3

Summary

Clovis caps how much of a residential lot a structure's footprint may cover. Table 2-3 of the Development Code sets a 30% to 40% maximum depending on zoning district, with a Director-approved bonus up to 45% and a 50% ceiling for cottage-home projects in Planning Area 7.

Maximum Parcel Coverage (8) 40% 40% ... (8) In single-family residential districts, the Director, through a single-family residential site plan review application, may grant a bonus parcel coverage provision of up to forty-five percent (45%) in compliance with subsection B of this section (Bonus parcel coverage). A particular model home, existing home or subdivision may be granted bonus parcel coverage based upon the provision of amenities identified in subsection B of this section. In single-family residential districts where a cottage home is proposed through the City's cottage home program, the maximum parcel coverage shall be fifty percent (50%) per Planning Area 7 (PA7) development standards.

Full Breakdown

030, Table 2-3 (Residential Zones General Development Standards Requirements by Individual Zoning District) fixes a maximum parcel coverage figure for every residential zone. The A, R-R, and R-A agricultural and rural-residential districts and the R-1-A and R-1-AH single-family districts cap coverage at 30%. The R-1-B district allows 35%, and the City's most common single-family zones, R-1-C and R-1, both permit up to 40% coverage. Footnote (8) to the table lets the Director grant a bonus coverage allowance of up to 45% through a single-family residential site plan review application, awarded under subsection B (Bonus parcel coverage) based on amenities the applicant provides.

Cottage-home projects processed through the City's cottage home program in Planning Area 7 (PA7) may reach 50% coverage, the highest ceiling anywhere in the code. 100. 030(D), which folds ADU floor area into the parcel coverage calculation for the primary lot.

Violations & Fines

Plans that exceed the district's Table 2-3 coverage maximum are rejected at plan check and the Building Division will not issue a permit until the footprint is reduced or a bonus coverage application is approved. If excess coverage is built without disclosure, the City can pursue code enforcement under Chapter 92 of Title 9, resulting in a correction notice, civil penalties, and a required reduction of the noncompliant structure.

Frequently Asked Questions

What is the maximum lot coverage for a house in Clovis?
It depends on the zoning district. R-1 and R-1-C single-family lots cap at 40% coverage, R-1-B allows 35%, and R-1-A, R-1-AH, R-R, and R-A cap at 30%, all set by Table 2-3 of Clovis Municipal Code Section 9.10.030.
Can I exceed the standard lot coverage limit in Clovis?
Yes. The Director may approve a bonus coverage allowance up to 45% through a single-family residential site plan review application under Section 9.10.030, footnote (8), based on amenities the project provides, such as added landscaping or a reduced garage footprint.
Does an ADU count toward lot coverage in Clovis?
Yes. Under Section 9.40.030(D), an accessory dwelling unit's floor area is added to the primary dwelling's footprint, and the combined parcel coverage cannot exceed the maximum allowed for the zoning district under Table 2-3.
What is the cottage home program coverage limit?
Cottage-home projects processed under the City's cottage home program in Planning Area 7 (PA7) may reach 50% parcel coverage, the highest cap in the Development Code, exceeding the standard 45% bonus allowance available to other single-family projects.

Sources & Official References

Other rules in Clovis

All Clovis rules

California rules heatmap·Compare Clovis to another location·View the California building setbacks & zoning overview

Get notified when Lot Coverage Limits in Clovis, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Lot Coverage Limits in Nearby Cities

How other cities in Fresno County handle lot coverage limits.

Fresno, CA
Some Restrictions