Key Facts

RE/RR building coverage max
30% of lot area
R-1A/R-1B/R-1C building coverage max
35%
R-2/R-3 building coverage max
50%
M-1 lot coverage max
70% (Sec. 28-317)
Urban Village lot coverage max
75%, 25% open space required

Summary

Titusville's Land Development Regulations cap building footprint, not overall lot coverage, in most residential zoning districts: Sec. 28-301 lists Residential Estate (RE) building coverage at 30 percent of lot area and marks lot coverage as not applicable. Only a handful of non-residential districts carry an actual lot-coverage ceiling: Light Industrial (M-1) is capped at 70 percent under Sec. 28-317, and the Urban Village (UV) district allows up to 75 percent under Sec. 28-328.

Sec. 28-301. - Residential Estate (RE). ... Building coverage, maximum (% of lot area) 30 Lot coverage, maximum (% of lot area) NA ... Sec. ... 28-317. - Light Industrial Services and Warehousing (M-1). ... Building coverage, maximum (% of lot area) NA Lot coverage, maximum (% of lot area) 70

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 54 Update 1 | Land Development Regulations: Supplement 19 Update 1 | Technical Manuals: Supplement 10 Update 1).

Full Breakdown

Titusville's Intensity and Dimensional Standards tables in Chapter 28, Article VI use two separate metrics: 'Building coverage, maximum (% of lot area)' and 'Lot coverage, maximum (% of lot area).' For every single-family and duplex district the code publishes, including Residential Estate (RE, Sec. 28-301), Rural Residential (RR, Sec. 28-302), Single-Family Low Density (R-1A, Sec. 28-303), Single-Family Medium Density (R-1B, Sec. 28-304) and Single-Family High Density (R-1C, Sec. 28-305), the lot-coverage line is printed as 'NA': only the building footprint is capped, at 30 percent in RE and RR and 35 percent in R-1A through R-1C. Multifamily districts R-2 and R-3 raise the building-coverage cap to 50 percent, still with no separate lot-coverage limit. The manufactured-housing districts RMH-1 and RMH-2 cap building coverage at 40 percent, also with lot coverage marked NA.

A true lot-coverage ceiling, covering the building footprint plus driveways, parking, patios and other impervious surface, appears only in a small set of non-residential and special districts. Sec. 28-317 caps Light Industrial Services and Warehousing (M-1) at 70 percent lot coverage, with building coverage itself left unregulated (NA). Sec. 28-328 caps the Urban Village (UV) district, created for the U.S. 1 Corridor Master Plan redevelopment sites, at 75 percent lot coverage, footnoted to require that at least 25 percent of the site's total gross acreage be dedicated as common open space. Because these standards sit inside the district-by-district dimensional tables, a lot's actual limit depends entirely on which zoning district it carries, and any proposal exceeding the applicable figure needs either a site redesign or an administrative waiver under Sec. 28-10/28-11 or a variance through the Board of Adjustments and Appeals.

Violations & Fines

Exceeding the applicable coverage figure on a site plan blocks building-permit issuance; the Community Development Department reviews footprint and impervious calculations at plan review under Chapter 28's dimensional standards. Existing development that exceeds the cap becomes a nonconforming structure under Sec. 28-16, subject to the limits on expansion in Chapter 34, Article VII. Relief requires an administrative waiver under Sec. 28-10 or 28-11, or a variance heard by the Board of Adjustments and Appeals.

Frequently Asked Questions

Does Titusville cap lot coverage in single-family zoning districts?
No separate lot-coverage limit applies. Sec. 28-301 through Sec. 28-305 print 'Lot coverage, maximum (% of lot area): NA' for Residential Estate, Rural Residential and the R-1A through R-1C single-family districts. Instead, those districts cap the building footprint itself, called 'building coverage,' at 30 percent in RE and RR and 35 percent in R-1A, R-1B and R-1C.
Which Titusville zoning districts do cap total lot coverage?
Light Industrial Services and Warehousing (M-1) caps lot coverage at 70 percent under Sec. 28-317, and the Urban Village (UV) district caps it at 75 percent under Sec. 28-328, with a footnote requiring 25 percent of the site kept as common open space. Both districts leave the separate 'building coverage' line unregulated.
What happens if a project exceeds the coverage maximum?
Community Development staff catch it at site-plan or building-permit review, since the dimensional standards in Chapter 28, Article VI are checked before a permit issues. An owner who wants to exceed the figure needs an administrative waiver under Sec. 28-10 or 28-11, or a variance from the Board of Adjustments and Appeals.

Sources & Official References

Other rules in Titusville

All Titusville rules

Florida rules heatmap·Compare Titusville to another location·View the Florida building setbacks & zoning overview

Get notified when Lot Coverage Limits in Titusville, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Lot Coverage Limits in Nearby Cities

How other cities in Brevard County handle lot coverage limits.

Melbourne, FL
Some Restrictions
Palm Bay, FL
Some Restrictions
Cocoa, FL
Some Restrictions