Washington County, MN Building Setbacks & Zoning: Lot Coverage Limits (2026)
Key Facts
- Coverage limit
- 25% of lot as impervious surface
- Governing section
- Development Code Chapter Six, Section 8.4
- Counted surfaces
- Structures, decks, patios, walks, driveways
- Enforcing office
- Washington County Zoning Administrator
- Compliance check
- Certificate of Compliance under Section 15.1
- Effective date
- June 5, 2018
Summary
In Washington County's Shoreland Management Overlay District, no more than 25 percent of a lot can be covered by impervious surface under Development Code Chapter Six, Section 8.4. The cap folds in every building, deck, patio, walk and driveway, whether paved or not, and the Zoning Administrator checks it before signing off on a building or grading permit.
Lot Coverage.
A maximum of twenty-five (25) percent of the lot may be covered with impervious surface. This includes all structures, decks, patios, walks, and surfaced or unsurfaced driveways.
Full Breakdown
4 of Chapter Six, the Shoreland Management Regulations effective June 5, 2018, sets the coverage limit in one sentence: 'A maximum of twenty-five (25) percent of the lot may be covered with impervious surface. ' The chapter's Section 3 definitions confirm the scope, describing impervious surface as the percentage of the lot covered with buildings including all appurtenances, driveways and sidewalks, so a gravel or dirt driveway counts toward the 25 percent the same as a poured patio. 3. 1 requires submittal to the County Zoning Administrator, who screens for suitability including flooding risk, wetlands, and inadequate sewage capacity, factors that interact directly with how much of a lot can be hardened.
1 requires the Zoning Administrator to verify that Chapter Six's requirements, including the 25 percent cap, have been met before issuing a Certificate of Compliance for any activity requiring a building or grading permit, and the code deems any construction inconsistent with a required permit a violation of the chapter.
Violations & Fines
Covering more than 25 percent of a shoreland lot with buildings, decks, patios, walks or driveways, paved or not, keeps the Zoning Administrator from issuing the Certificate of Compliance Section 15.1 requires before a building or grading permit closes. The Development Code deems any construction inconsistent with a required permit a Chapter Six violation, and relief requires a variance from the Board of Adjustment and Appeals.
Frequently Asked Questions
How much of my lakeshore lot can I pave or build on in Washington County, MN?
Does a gravel driveway count toward the 25% impervious limit?
What happens if a shoreland lot exceeds the 25% coverage cap?
Sources & Official References
Other rules in Washington County
Compare Washington County to another location·View the Minnesota building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.