Key Facts
- Governing sections
- Barrow County Code §§ 89-403, 89-404, Table 4.1
- AG district setbacks
- 50 ft front, 40 ft side, 40 ft rear
- R-3 single-family setbacks
- 30 ft front, 10 ft side, 40 ft rear
- Arterial road setback
- 100 feet from right-of-way, all districts
- Enforcing agency
- Planning and Community Development, unincorporated Barrow County
- Relief
- Variance required for setback exceptions
Summary
In unincorporated Barrow County, every principal building must sit back from its street, side and rear lot lines by the exact distances Table 4.1 sets for the property's zoning district. County Code Section 89-404 also pushes the front setback out to 100 feet along any arterial road, and the strictest rural district, AG, keeps a 50-foot front, 40-foot side and 40-foot rear yard.
Sec. 89-404. - Minimum setbacks; principal buildings. (a)All principal buildings on a lot shall be setback from the street right-of-way lines and from the side and rear lot lines bounding the lot no less than the distances shown on Table 4.1.(b)Minimum setback along highways. For any lot that adjoins an arterial road, the minimum building setback along such road shall be 100 feet from the right-of-way line. ... District Use Well and Septic Tank Public Infrastructure Min. Lot Width (feet) Building Setback (feet)***** Max. Building Height (feet) Max. Density* Min. Lot Size Max. Density* Min. Lot Size Front Side Rear AG All uses ... 150 50 40 40
Full Breakdown
1, adopted under section 89-403 and applied to principal buildings by section 89-404(a), which requires every principal building to sit back from the street right-of-way and from the side and rear lot lines no less than the distances the table lists for that district. The table sets separate front, side and rear setback columns for each district: the AG agricultural district requires a 50-foot front setback, 40-foot side setback and 40-foot rear setback on a minimum 150-foot lot width, while tighter districts like R-3 single-family reduce the front setback to 30 feet and the side setback to 10 feet on a 60-foot lot width.
Section 89-404(b) adds a separate highway rule: on any lot that adjoins an arterial road, including designated highways, the minimum principal building setback along that road jumps to 100 feet from the right-of-way line, regardless of the district's normal front setback. Accessory structures follow a different, generally shorter setback scheme under section 89-407, and fences and freestanding walls have no minimum setback from a property line under section 89-407(b)(1) except where they would block the visibility triangle at a street intersection. 1's minimum, under section 89-403(b)(4), if septic conditions demand it. Planning and Community Development reviews setback compliance at building permit issuance.
Violations & Fines
Building a principal structure closer to a lot line than Table 4.1 allows, or inside the 100-foot arterial-road setback under section 89-404(b), is a Unified Development Code violation Barrow County Planning and Community Development can catch at permit review or through a code compliance complaint. An encroaching foundation or addition can be denied a certificate of occupancy, ordered relocated or removed, and a property owner who wants relief from the table's numbers must apply for a variance through the board of appeals rather than build first and ask later.
Frequently Asked Questions
How far back does a house have to be from the road in unincorporated Barrow County's AG district?
Do stricter setbacks apply on a busy road?
Do accessory buildings like garages follow the same setback as the house?
Sources & Official References
Other rules in Barrow County
Compare Barrow County to another location·View the Georgia building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.