Framingham, MA Building Setbacks & Zoning: Setback Rules (2026)
Key Facts
- Setback abutting residential
- 30 feet, § 435-27E(4)
- B-1 District exception
- 10 feet side setback
- Exempt uses
- Single-family and two-family residential lots
- Related buffer
- 15-ft landscaped buffer, 5 ft in B-1, § 435-27F(4)(a)
- Enforcing agency
- Building Commissioner, fine up to $300, § 435-42
Summary
In the City of Framingham, a nonresidential building whose side lot line touches a Single-Family Residential or General Residence district must keep a 30-foot side setback under Zoning Ordinance § 435-27E(4). That distance drops to 10 feet for lots in the Neighborhood Business (B-1) District, and the rule does not apply to single-family or two-family lots, which follow the Table of Dimensional Regulations instead.
(4) Side setback abutting residential district. Where a side lot line of a lot in a nonresidential district abuts a Single-Family Residential or General Residence Zoning District, there shall be a minimum side setback requirement for buildings on such lot of 30 feet; except in the Neighborhood Business (B-1) Districts, where such minimum side setback requirement for buildings on such lot shall be 10 feet. This setback regulation for such lot in a nonresidential district shall not be applicable if such lot is for a single-family or two-family residential use, in which case the setbacks in the Table of Dimensional Regulations shall apply.
Full Breakdown
Framingham layers this buffer setback on top of the base yard requirements set district by district in § 435-27B's Table of Dimensional Regulations. The trigger is adjacency: whenever a nonresidential lot's side line abuts a Single-Family Residential district (R-1 through R-4) or a General Residence district, § 435-27E(4) pushes the side setback for buildings on that nonresidential lot out to 30 feet, well beyond most base district minimums, so residential neighbors get a wider buffer than the underlying table alone would provide. The Neighborhood Business (B-1) District gets a carve-out: the same abutting-residential condition only requires a 10-foot side setback there, reflecting B-1's tighter, more urban lot pattern along village and downtown corridors.
The section is explicit that it targets commercial and other nonresidential uses only. A single-family or two-family residential lot next to another residential district is not subject to this abutment rule at all; it simply follows whatever side setback the Table of Dimensional Regulations sets for its own zoning district. The buffer setback also works alongside the open space buffer requirement in § 435-27F(4)(a), which separately requires a 15-foot landscaped buffer, or five feet in the B-1 District, wherever a nonresidential use abuts a residential district or a single-family or two-family use, so a qualifying B-1 site can face both a 10-foot setback and a five-foot planted buffer stacked against the same property line.
Violations & Fines
The Building Commissioner enforces the setback requirements of Chapter 435, including § 435-27E(4), under § 435-42 of the Framingham City Code. Constructing or maintaining a building that violates the 30-foot or 10-foot side setback is a zoning violation carrying a fine of up to $300 for each offense, with every day of continued violation counted separately, or a $50 noncriminal citation under MGL c. 40, § 21D.
Frequently Asked Questions
How far must a commercial building sit from a residential lot line in Framingham?
Does the 30-foot setback apply to a two-family house next to another residential zone?
Is there also a landscaping requirement next to residential property in Framingham?
Sources & Official References
Other rules in Framingham
Compare Framingham to another location·View the Massachusetts building setbacks & zoning overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.