Environmental Rules in Brooklyn Park, MN (2026)
4 verified environmental rules for Brooklyn Park, Minnesota, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Brooklyn Park requires a stormwater management plan for every subdivision, conditional use permit or grading permit that involves land-disturbing activity, filed with the Engineering Department before any permit issues. Chapter 153 also requires a wetland assessment for work near wetlands and an erosion control plan for building, subdivision or grading applications, with limited exemptions for small excavations and emergency work.
Brooklyn Park Stormwater Management Requirements
Some RestrictionsBrooklyn Park City Code § 153.03
§ 153.03 SCOPE. ... (A) Applicability. (1) Every applicant for subdivision approval, conditional use permit, or a grading permit to allow land disturbing activities must submit a stormwater management plan to the Engineering Department. The stormwater management plan shall be submitted with the building permit, grading permit application, or as directed by the Engineering Department. No subdivi...
Erosion Control
Every preliminary plat in the City of Brooklyn Park must address erosion and sediment control: staged construction, minimal soil exposure, three inches of restored topsoil, and compliance with the state's Best Management Practices Handbook, all subject to City Engineer and stormwater inspection.
Brooklyn Park Erosion And Sediment Control Rule
Some RestrictionsBrooklyn Park City Code § 151.026(J)
(J) Erosion and sediment control shall be addressed as follows: (1) The development shall conform to the natural limitations presented by topography and soil so as to create the least potential for soil erosion. (2) Erosion and siltation control measures shall be coordinated with the different stages of construction. Appropriate control measures shall be installed prior to development whe...
Flood Zones
The City of Brooklyn Park regulates Floodway, Flood Fringe, and General Flood Plain overlay districts under City Code § 152.801, requiring a Zoning Administrator permit before building, filling, excavating, or changing the use of any structure or land within the mapped flood plain.
Brooklyn Park Floodplain Development Rules
Significant RestrictionsBrooklyn Park City Code § 152.801
§ 152.801 FLOOD HAZARD OVERLAY. The legislature of the State of Minnesota has, in M.S. Ch. 103F and 462 delegated the responsibility to local government units to adopt regulations designed to minimize flood losses. ... (C) ( ... 4) Permit requirements. (a) Permit required. For that portion of the property or structures in the flood plain, a permit issued by the Zoning Administrator in con...
Flood Elevation Requirements
Brooklyn Park's Flood Hazard Overlay requires every structure in the Flood Fringe District, including accessory buildings, to be elevated on fill so the lowest floor sits at or above the regulatory flood protection elevation, defined as two feet above the regional flood elevation. Section 152.1016 applies the same standard to residential basement construction citywide.
Brooklyn Park Flood Elevation and Freeboard Rules
Some RestrictionsBrooklyn Park City Code § 152.801(D)(4)(b)
§ 152.801 FLOOD HAZARD OVERLAY. ... (D) Floodway, Flood Fringe, and General Flood Plain performance standards and uses. ... (4) Flood Fringe District (FF). ... (b) Standards for Flood Fringe permitted uses. ... All structures, including accessory structures, must be elevated on fill so that the lowest floor, as defined, is at or above the regulatory flood protection elevation. The finished fill...
Looking for Hennepin County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Brooklyn Park city rules.
Environmental Rules in Hennepin County →