Environmental Rules in East Brunswick, NJ (2026)
4 verified environmental rules for East Brunswick, New Jersey, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
East Brunswick Township Code § 192-53 requires green infrastructure stormwater management for major development, which means one or more acres of disturbance or 1/4 acre of new regulated impervious surface. Smaller projects must retain two gallons of stormwater on site for each square foot of impervious surface above the allowed lot coverage.
East Brunswick Township Stormwater Control Rules
Significant RestrictionsEast Brunswick Township Code § 192-53
Flood control, groundwater recharge, and pollutant reduction shall be achieved through the use of stormwater management measures, including green infrastructure best management practices (GI BMPs) and nonstructural stormwater management strategies. ... Purpose. ... The purpose of this section is to establish minimum stormwater management requirements and controls for "major development," as def...
Erosion Control
East Brunswick Township Code § 192-51 requires every development application to follow the New Jersey State Soil Conservation Committee's soil erosion and sediment control standards. Plans must be phased with the development schedule, sediment stays on site, and installed control measures are maintained for one year or until permanently stabilized, whichever is longer.
East Brunswick Township Soil Erosion and Sediment Control
Some RestrictionsEast Brunswick Township Code § 192-51
All applications shall comply with the standards for Soil Erosion & Sediment Control in New Jersey by the New Jersey State Soil Conservation Committee. All plans shall incorporate soil erosion and sediment control programs phased according to the scheduled progress of the development, including anticipated starting and completion dates. ... Sediment shall be retained on site. ... Diversions, se...
Flood Zones
In East Brunswick Township, anyone who intends to conduct development in a flood hazard area must first apply to the Floodplain Administrator, who is the Director of Planning and Engineering, and obtain the required permit. The Township Council's Floodplain Management Regulations run alongside the Uniform Construction Code and the state Flood Hazard Area Control Act, and a violation carries a fine of up to $1,250.
East Brunswick Township Flood Damage Prevention Rules
Significant RestrictionsEast Brunswick Township Code § 228-230.101
101.2 Scope. These regulations, in combination with the flood provisions of the Uniform Construction Code and FHACA shall apply to all proposed development in flood hazard areas established in § 228-230.102 of these regulations. ... 101.8 Violations and penalties for noncompliance. No structure or land shall hereafter be constructed, relocated to, extended, converted, or altered without full co...
Flood Elevation Requirements
In East Brunswick Township, the Local Design Flood Elevation is the best available flood elevation plus freeboard. For a delineated watercourse that means one foot of freeboard or the amount N.J.A.C. 7:13 requires, and for AO Zones it is the highest adjacent grade plus the mapped depth plus one foot. Critical facilities carry more.
East Brunswick Township Local Design Flood Elevation
Some RestrictionsEast Brunswick Township Code § 228-230.102
102.3 Establishing the Local Design Flood Elevation (LDFE). The Local Design Flood Elevation (LDFE) is established in the flood hazard areas determined in § 228-230.102.2, above, using the best available flood hazard data sources, and the Flood Hazard Area Control Act minimum statewide elevation requirements for lowest floors in A, Coastal A, and V Zones, ASCE 24 requirements for critical facil...