Key Facts
- Delineated watercourse
- Best available elevation plus one foot of freeboard, or N.J.A.C. 7:13
- AO Zone
- Highest adjacent grade plus mapped depth plus one foot
- AO Zone, no depth listed
- Three feet above the highest adjacent grade
- Class IV critical facilities
- 500-year or design flood elevation plus two feet, whichever is higher
- Undelineated stream trigger
- Contributory drainage area of 50 acres or more
- Engineering analysis
- Sealed by a licensed professional engineer
Summary
In East Brunswick Township, the Local Design Flood Elevation is the best available flood elevation plus freeboard. For a delineated watercourse that means one foot of freeboard or the amount N.J.A.C. 7:13 requires, and for AO Zones it is the highest adjacent grade plus the mapped depth plus one foot. Critical facilities carry more.
102.3 Establishing the Local Design Flood Elevation (LDFE). The Local Design Flood Elevation (LDFE) is established in the flood hazard areas determined in § 228-230.102.2, above, using the best available flood hazard data sources, and the Flood Hazard Area Control Act minimum statewide elevation requirements for lowest floors in A, Coastal A, and V Zones, ASCE 24 requirements for critical facilities as specified by the building code, plus additional freeboard as specified by this article. At a minimum, the Local Design Flood Elevation shall be as follows: A. For a delineated watercourse, the elevation associated with the Best Available Flood Hazard Data Area determined in § 228-230.102.2, above, plus one foot or as described by N.J.A.C. 7:13 of freeboard; or ... C. AO Zones. ... For Zone AO areas on the municipality's FIRM (or on preliminary flood elevation guidance from FEMA), the Local Design Flood Elevation is determined from the FIRM panel as the highest adjacent grade plus the depth number specified plus one foot of freeboard. If no depth number is specified, the Local Design Flood Elevation is three feet above the highest adjacent grade.
Full Breakdown
Section 228-230.102 of the East Brunswick Township Code, in paragraph 102.3, sets the Local Design Flood Elevation (LDFE). It is built from the best available flood hazard data, the state Flood Hazard Area Control Act minimum elevation requirements for lowest floors in A, Coastal A and V Zones, ASCE 24 requirements for critical facilities, and additional freeboard added by the article. Those are minimums.
For a delineated watercourse, the LDFE is the elevation of the Best Available Flood Hazard Data Area plus one foot of freeboard, or the freeboard N.J.A.C. 7:13 describes. For an undelineated watercourse with a contributory drainage area of 50 acres or more, the applicant must supply either an unexpired NJDEP Flood Hazard Area Verification plus one foot of freeboard and any additional ASCE 24 freeboard, or a design flood elevation worked out by Method 5 or Method 6 under N.J.A.C. 7:13 plus one foot of freeboard.
In AO Zones, the LDFE is read from the FIRM panel as the highest adjacent grade plus the depth number specified plus one foot of freeboard. If the panel gives no depth number, the LDFE is three feet above the highest adjacent grade.
Critical facilities face a higher bar. New and substantially improved Flood Design Class IV Critical Facilities must be built to the higher of the 0.2% annual chance (500-year) flood elevation or the Flood Hazard Area Design Flood Elevation with an additional two feet of freeboard under ASCE 24. Class III Critical Facilities in coastal high hazard areas use the same comparison with an additional one foot of freeboard.
Where design flood elevations are not specified, § 228-230.103 lets the Floodplain Administrator require the applicant to use federal or state data, or to commission a hydrologic and hydraulic analysis sealed by a licensed professional engineer. The Floodplain Administrator then verifies that the permit applies the best available data and the LDFE rules correctly, and passes the result to the Construction Official.
Violations & Fines
A building or structure without documentation of the elevation of its lowest floor, or other required design certifications, is presumed to be a violation under § 228-230.108 until that documentation is provided. The Floodplain Administrator can serve notices of violation and stop-work orders. Under § 228-230.101 a violator faces a fine of not more than $1,250, up to 90 days in jail or community service, with a 30-day cure period.
Frequently Asked Questions
How much freeboard does East Brunswick Township require?
What if my lot is on a small stream with no FEMA map?
How is the elevation set in an AO Zone?
Who checks that my permit uses the right elevation?
Sources & Official References
Other rules in East Brunswick
Compare East Brunswick to another location·View the New Jersey environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in this county handle flood elevation requirements.