Edison, NJ Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Base freeboard
- 1 foot minimum
- Class IV critical facilities
- +2 feet freeboard
- Class III critical facilities (coastal)
- +1 foot freeboard
- Governing section
- Section 33-102.3
Summary
Edison Township requires new construction in flood hazard areas to add at least one foot of freeboard above the base flood elevation.
For a delineated watercourse, the elevation associated with the Best Available Flood Hazard Data Area determined in Section 33-102.2, above plus one foot or as described by N.J.A.C. 7:13 of freeboard; or
b. For any undelineated watercourse (where mapping or studies described in 33-102.2a and b above are not available) that has a contributory drainage area of 50 acres or more, the applicants must provide one of the following to determine the Local Design Flood Elevation:
1. A copy of an unexpired NJDEP Flood Hazard Area Verification plus one foot of freeboard and any additional freeboard as required by ASCE 24; or 2. A determination of the Flood Hazard Area Design Flood Elevation using Method 5 or Method 6 (as described in N.J.A.C. 7:13) plus one foot of freeboard and any additional freeboard as required by ASCE 24. Any determination using these methods must be sealed and submitted according to Section 33-105.2-3.
c. AO Zones. For Zone AO areas on the municipality's FIRM (or on preliminary flood elevation guidance from FEMA), the Local Design Flood Elevation is determined from the FIRM panel as the highest adjacent grade plus the depth number specified plus one foot of freeboard. If no depth number is specified, the Local Design Flood Elevation is three feet above the highest adjacent grade.
d.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4904708; v19 updated 2026-03-25; through 03-25-2026).
Full Breakdown
Edison calculates a Local Design Flood Elevation for every flood hazard area, and it is never just the base flood elevation. For a mapped watercourse, it's the best-available flood data elevation plus one foot of freeboard, or more under the state's Flood Hazard Area Control Act; undelineated watercourses over 50 acres need an NJDEP verification or an engineer-sealed Method 5 or 6 determination, also plus freeboard. Critical facilities get up to two additional feet under ASCE 24.
Violations & Fines
Building to the bare base flood elevation instead of the calculated Local Design Flood Elevation, or skipping the required freeboard, violates Section 33-102.3 and blocks permit issuance.
Frequently Asked Questions
Is one foot of freeboard always enough?
What if my property isn't on a FEMA map?
Sources & Official References
Other rules in Edison
Compare Edison to another location·View the New Jersey environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.