Stormwater Management

Georgetown prohibits anything but stormwater from entering its storm drains and creeks. Article V of Chapter 40 bars illegal discharges and illicit connections, and the Georgetown Stormwater Quality Division (GSQUAD) enforces it with a notice of violation first, then citations of $50.00 and $100.00, and a misdemeanor charge carrying $100.00 to $500.00 for each separate offense.

Georgetown Stormwater and Illicit Discharge Rules

Some Restrictions

Georgetown Code §§ 40-537, 40-544

(a) Prohibition of illegal discharges. No person shall discharge or cause to be discharged into the stormwater system or watercourses any materials, including, but not limited to, pollutants or waters containing any pollutants that cause or contribute to a violation of applicable water quality standards, other than stormwater. ... (c) Prohibition of illicit connections. (1) The construction, us...

Erosion Control

Georgetown requires a land disturbance permit before anyone disturbs 5,000 square feet or more of soil. Chapter 14, Article III ties each permit to a stormwater pollution prevention plan (SWPPP) reviewed by the Georgetown Stormwater Quality Division, sets slope, stabilization and inspection standards, and treats violations as Class 2 civil offenses under the code enforcement system.

Georgetown Erosion and Sediment Control Rules

Some Restrictions

Georgetown Code §§ 14-63, 14-66

(a) Land disturbance activity. ... (1) Any land disturbance activity that requires the disturbance of soil of 5,000 square feet or greater is subject to the provisions of this article and shall not take place without an authorized land disturbance permit. ... (c) At a minimum, the following requirements shall be met: (1) Cut and fill slopes shall be no greater than 2H:1V, unless approved by the...

Flood Zones

Anyone building or doing other development in a special flood hazard area in Georgetown needs a development permit from the floodplain administrator before work begins. Georgetown Code § 18-33 requires scaled plans, elevation data and an as-built elevation certification, and a missing or deficient certification is cause for a stop-work order.

Georgetown Flood Zone Development Permit Rules

Significant Restrictions

Georgetown Code § 18-33

(a) Generally. ... A development permit shall be obtained before any construction or other development begins within any special flood hazard area established in section 18-7 . Application for a development permit shall be made on forms furnished by the floodplain administrator prior to any development activities, and may include, but not be limited to, the following: plans in duplicate drawn t...

Flood Elevation Requirements

Georgetown requires the lowest floor of new and substantially improved residential structures in special flood hazard areas to sit no lower than two feet above the base flood elevation, basement, mechanical equipment and ductwork included. Non-residential buildings must match that elevation or be floodproofed to two feet above it, under Georgetown Code § 18-87.

Georgetown Base Flood Elevation Two-Foot Freeboard Rules

Some Restrictions

Georgetown Code § 18-87(1)

(1) Residential construction. New construction and substantial improvement of any residential structure (including manufactured home) shall have the lowest floor, including basement, mechanical equipment, and ductwork elevated no lower than two feet above the base flood elevation. ... a. In an AO zone, the lowest floor shall be elevated above the highest adjacent grade to a height equal to or h...