Skip to main content
CityRuleLookup

Environmental Rules in Hamburg Village, NY (2026)

4 verified environmental rules for Hamburg Village, New York, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

In the Village of Hamburg, only stormwater may enter the village storm sewer system, and illicit connections are prohibited, including old ones. Clean water goes to storm or combined sewers or an outlet approved by the Superintendent of Public Works. Violations carry fines up to $1,000 and are enforced by the Stormwater Management Officer.

Village of Hamburg Stormwater Discharge Rules

Some Restrictions

Village of Hamburg Code §§ 186-19, 186-20

§ 186-19. Appropriate discharge of unpolluted stormwater. Stormwater and all other water sources not containing pollutants shall be discharged to such sewers as are specifically designated as combined sewers or storm sewers, or to a natural outlet approved by the Superintendent of the Department of Public Works. The property owner is responsible for all grading, the receiver installation and th...

Erosion Control

In the Village of Hamburg, land development activity of one acre or more needs a stormwater pollution prevention plan with erosion and sediment controls before review. No more than five acres can be disturbed at one time, sediment traps are cleaned at 50 percent capacity loss, and inspections run every seven days.

Village of Hamburg Construction Erosion and Sediment Control

Some Restrictions

Village of Hamburg Code §§ 200-5, 200-7

B. Contents of stormwater pollution prevention plans. (1) All SWPPPs shall provide the following background information and erosion and sediment controls: ... (d) Construction phasing plan describing the intended sequence of construction activities, including clearing and grubbing, excavation and grading, utility and infrastructure installation, and any other activity at the site that results i...

Flood Zones

In the Village of Hamburg, any development in an area of special flood hazard needs a valid floodplain development permit under Chapter 146. The application fee is $50 and $0.02 per square foot, and the Town of Hamburg Supervising Code Enforcement Officer serves as the local administrator.

Village of Hamburg Floodplain Development Permit

Some Restrictions

Village of Hamburg Code § 146-4B

§ 146-4. Development permits. ... B. The floodplain development permit. (1) A floodplain development permit is hereby established for all construction and other development to be undertaken in areas of special flood hazard in this community for the purpose of protecting its citizens from increased flood hazards and ensuring that new development is constructed in a manner that minimizes its expo...

Flood Elevation Requirements

In the Village of Hamburg, new and substantially improved residential structures in areas of special flood hazard must have the lowest floor, including the basement, at least two feet above the base flood elevation in Zones A1-A30, AE and AH. Zone A without elevation data requires three feet above the highest adjacent grade.

Village of Hamburg Residential Flood Elevation Rules

Some Restrictions

Village of Hamburg Code § 146-5C(1)

§ 146-5. General standards. ... C. Residential structures. (1) Elevation. The following standards apply to new and substantially improved residential structures located in areas of special flood hazard, in addition to the requirements in § 146-5A(1), Subdivision proposals, and § 146-5A(2), Encroachments, and § 146-5B, Standards for all structures: (a) Within Zones A1-A30, AE and AH, and also Zo...

Looking for Erie County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Hamburg Village city rules.

Environmental Rules in Erie County →