Building Safety in High Point, NC (2026)

7 verified building safety rules for High Point, North Carolina, sourced directly from the municipal code and official government pages.

Verified from official government sources

Fire Sprinkler Requirements

High Point requires city approval, a tap fee, and backflow preventors before any fire sprinkler system connects to the municipal water supply, and bans using the line for any non-fire purpose.

High Point Fire Sprinkler Connection Rules

Some Restrictions

High Point Code of Ordinances § 8-2-22

When a fire protection (sprinkler) system is installed and connected to the city water system, the fire protection system shall be kept separate from all other water uses at all times. ... It shall be unlawful to tap any portion of the fire protection system for any other purpose. ... No sprinkler system will be approved by the city using chemicals or other agents without the use of approved ba...

Childcare Center Rules

High Point requires every day care center to hold State licensing, front on a street classified higher than a residential local street, and fully enclose its outdoor play yard with a fence at least 4 feet tall under § 4.3.3.B.1.

High Point Day Care Center Site Rules

Some Restrictions

High Point Development Ordinance § 4.3.3.B.1

A day care center shall comply with the following standards: (a) Meet all applicable State licensing requirements; ... (d) Outdoor recreation areas shall: (1) Be located behind the front building line of the principal building; (2) Be completely enclosed by a fence that is at least 4 feet in height; and (3) Be safely segregated from parking, loading, or service areas.

Green Building Code

High Point, North Carolina has no mandatory green building code, but its Development Ordinance rewards LEED-certified construction with bonus points toward optional development incentives.

High Point LEED Certification Incentive

Few Restrictions

High Point Development Ordinance § 5.15.4 (Table 5.15.4, Sustainable Development Features — LEED Certification)

Construction of the principal structure to meet or exceed LEED Platinum certification standards Provision of Green Building Certification Institute's verification of project compliance (may be provided within 1 year following occupancy) AA [1] Construction of the principal structure to meet or exceed LEED Gold certification standards BBB [2] Construction of the principal structure to meet or ...

Building Permits

Before building, rebuilding, altering, repairing, removing, or tearing down any structure in High Point, you need a written permit from the director of planning and development.

High Point Building Permit Requirement

Some Restrictions

High Point Code of Ordinances § 9-2-41(a)

Building permit. No person shall commence or proceed with the construction, reconstruction, alteration, repair, removal or demolition of any building or other structure, or any part thereof, without a written permit therefor from the director of planning and development.(b)Plumbing permit. No person shall commence or proceed with the installation, a extension or general repair of any plumbing s...

Electrical Permits

High Point requires a written permit from the city electrical inspector before anyone installs, extends, alters or repairs electrical wiring, devices, appliances or equipment. The rule covers the city and the Guilford County portion of its extraterritorial area under the National Electrical Code, 1984 edition. Skipping the permit draws escalating civil penalties under the city's general enforcement section.

High Point Electrical Permit Requirement

Some Restrictions

High Point Code of Ordinances § 9-2-41(d)

Sec. 9-2-41. - Permits required.(a)Building permit. No person shall commence or proceed with the construction, reconstruction, alteration, repair, removal or demolition of any building or other structure, or any part thereof, without a written permit therefor from the director of planning and development.(b)Plumbing permit. No person shall commence or proceed with the installation, a extension ...

Plumbing Permits

High Point law requires a written permit from the city plumbing inspector before any installation, extension, or general repair of a plumbing system begins.

High Point Plumbing Permit Requirement

Some Restrictions

High Point Code of Ordinances § 9-2-41(b)

Plumbing permit. No person shall commence or proceed with the installation, a extension or general repair of any plumbing system without a written permit from the plumbing inspector.(c)Heating-air conditioning permit. No person shall commence or proceed with the installation, extension, alteration or general repair of any heating or cooling equipment system without a written permit from the hea...

Building Inspections

High Point requires a building permit before any excavation, construction, or structural alteration begins, plus a certificate of occupancy filed alongside it and issued within 10 days after the work is finished and found to comply.

High Point Building Permit and Inspection Process

Some Restrictions

High Point Code of Ordinances § 9-2-49

No excavation for foundation nor the erection, construction or structural alteration of any structure or part of a structure, nor occupancy of streets or alleys with building materials or temporary structures for construction purposes shall be undertaken until a permit therefor shall have been issued by the administrative officer. No such permit shall be issued before application has been made ...