Environmental Rules in Medina, OH (2026)
4 verified environmental rules for Medina, Ohio, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
Medina requires a Comprehensive Stormwater Management Plan for new development and redevelopment, with review fees up to $2,500, a $1,500-per-acre bond, and misdemeanor penalties up to $500 and 60 days in jail for violations under Chapter 1347.
Medina Comprehensive Stormwater Management Rules
Significant RestrictionsMedina Codified Ordinances § 1347.01
The purpose of this regulation is to establish technically feasible and economically reasonable stormwater management standards to achieve a level of stormwater quality and quantity control that will minimize damage to property and degradation of water resources and will promote and maintain the health, safety, and welfare of the citizens of the City of Medina ... This regulation requires owner...
Erosion Control
Medina requires an approved Stormwater Pollution Prevention Plan before soil-disturbing construction begins, backed by a $1,500 bond, stop-work orders and escalating fines up to $1,000, with a misdemeanor penalty of up to $500 and 60 days in jail under Chapter 1349.
Medina Construction Erosion & Sediment Control
Significant RestrictionsMedina Codified Ordinances § 1349.01
The purpose of this regulation is to establish technically feasible and economically reasonable standards to achieve a level of erosion and sediment control that will minimize damage to property and degradation of water resources, and will promote and maintain the health and safety of the citizens of City of Medina ... This regulation applies to all parcels used or being developed, either wholl...
Flood Zones
Medina's floodplain code bans specific hazardous uses inside any FEMA-mapped special flood hazard area and requires a floodplain development permit for everything else. Private water supply systems, infectious waste treatment facilities, and bulk gasoline or diesel storage are flatly prohibited. The Floodplain Administrator, working with the Building Department, enforces the standards under Chapter 1379.
Medina Flood Hazard Area Development Rules
Some RestrictionsMedina Codified Ordinances § 1379.04(a)(2)
1379.04 USE AND DEVELOPMENT STANDARDS FOR FLOOD HAZARD REDUCTION. The following use and development standards apply to development wholly within, partially within, or in contact with any special flood hazard area as established in Section 1379.01(f). ... (2) Prohibited Uses. A. Private water supply systems in all special flood hazard areas identified by FEMA, permitted under Section 3701 of the...
Flood Elevation Requirements
Medina requires two feet of freeboard above base flood elevation for any new or substantially improved residential structure. The Flood Protection Elevation defined in Section 1379.02(q) sets the lowest-floor target; where no base flood elevation data exists, the fallback is two feet above the highest adjacent natural grade under Section 1379.04(d)(5).
Medina Base Flood Elevation Freeboard Rule
Some RestrictionsMedina Codified Ordinances §§ 1379.02(q), 1379.04(d)(5)
(q) Flood Protection Elevation: The Flood Protection Elevation, or FPE, is the base flood elevation plus two (2) feet of freeboard. In areas where no base flood elevations exist from any authoritative source, the flood protection elevation can be historical flood elevations, or base flood elevations determined and/or approved by the Floodplain Administrator. ... New construction and substantial...