Medina, OH Environmental Rules: Stormwater Management (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing chapter
Codified Ordinances Ch. 1347
Design storm standard
100-year, 24-hour event
Residential review fee
$250 per lot
Commercial full SWP3 fee
$2,500
Performance bond
$1,500 per acre
Max penalty
$500 fine, 60 days jail

Summary

Medina requires a Comprehensive Stormwater Management Plan for new development and redevelopment, with review fees up to $2,500, a $1,500-per-acre bond, and misdemeanor penalties up to $500 and 60 days in jail for violations under Chapter 1347.

The purpose of this regulation is to establish technically feasible and economically reasonable stormwater management standards to achieve a level of stormwater quality and quantity control that will minimize damage to property and degradation of water resources and will promote and maintain the health, safety, and welfare of the citizens of the City of Medina ... This regulation requires owners who develop or re-develop their property within the City of Medina to: (1) Control stormwater runoff from their property and ensure that all stormwater control measures (SCMs) are properly designed, constructed, and maintained.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025-01: Local legislation current through June 24, 2025 | State legislation current through December 31, 2024).

Full Breakdown

01. Owners must control the volume, rate and quality of stormwater runoff so surface and ground water are protected and flooding and erosion potential are not increased, and must incorporate stormwater controls into site planning at the earliest possible stage. Public entities, including the State of Ohio and Medina County, must comply for linear projects within public rights-of-way. 09, all stormwater control measures must prevent structure flooding during the 100-year, twenty-four-hour storm event and maintain predevelopment runoff patterns, and stormwater ponds must provide at least one foot of freeboard above the projected peak stage during that same storm event.

14 run $250 for individual residential lots and duplexes, $750 for a commercial Abbreviated Stormwater Pollution Prevention Plan, and $2,500 for a commercial Full SWP3. 15 requires a $1,500-per-acre performance bond before soil-disturbing work can begin, returned only after eighty percent of lots or the project reach permanent stabilization and the City Engineer completes an as-built inspection. C. 2506. 99 makes a violation a third-degree misdemeanor punishable by up to $500 and sixty days in jail per offense, with each day of noncompliance a separate offense.

Violations & Fines

Developing property without an approved Comprehensive Stormwater Management Plan, or failing to maintain approved stormwater control measures, is a third-degree misdemeanor under Section 1347.99, punishable by a fine of up to $500 and imprisonment of up to sixty days, with each day of violation a separate offense. The City may also pursue a court action to restrain or abate the violation.

Frequently Asked Questions

When does Medina require a stormwater management plan?
Section 1347.01 requires a Comprehensive Stormwater Management Plan for owners developing or redeveloping property, covering highways, subdivisions, industrial, commercial, institutional and residential projects and farm building activities, unless a specific exemption in that section applies.
How much does stormwater plan review cost in Medina?
Section 1347.14 sets review fees at $250 for individual residential lots and duplexes, $750 for a commercial Abbreviated Stormwater Pollution Prevention Plan, and $2,500 for a commercial Full Stormwater Pollution Prevention Plan.
What bond does a Medina developer need to post for stormwater compliance?
Section 1347.15 requires a $1,500-per-acre performance guarantee, in cash, bond or letter of credit, deposited with the City before soil-disturbing activity begins, refunded once eighty percent of the project reaches permanent stabilization and passes the City Engineer's as-built inspection.

Sources & Official References

Other rules in Medina

All Medina rules

Compare Medina to another location·View the Ohio environmental rules overview

Get notified when Stormwater Management in Medina, OH changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.