Stormwater Management

The City of New Brunswick charges an annual stormwater user fee of seventy-seven dollars ($77.00) per equivalent residential unit on every developed property except exempt property. Under Chapter 13.12 one ERU is 2,102 square feet of impervious surface, and no developed property is billed for less than 1.0 ERU.

New Brunswick NJ Stormwater Utility User Fee

Some Restrictions

New Brunswick Municipal Code § 13.12.090

There shall be imposed a user fee on each and every developed property in the city, except exempt property as defined by the Clean Stormwater and Flood Reduction Act (P.L. 2019, c42). Said annual fee will be seventy-seven dollars ($77.00) per equivalent residential unit (ERU).

Erosion Control

In the City of New Brunswick, New Jersey, Section 17.07.100 bars new development, grading or vegetation stripping on slopes of twenty percent or steeper, with a redevelopment exception, and applies to site disturbance of 5,000 square feet or more or any project needing a building permit. The stated purpose is limiting soil loss, erosion and siltation.

New Brunswick NJ Steep Slope and Erosion Rules

Significant Restrictions

New Brunswick Municipal Code § 17.07.100

A.Purpose. ... Construction on steep slopes results in accelerated runoff of stormwater. The destruction of natural vegetation and the increase in impervious surfaces compounds the problems of runoff. Excess runoff causes loss of topsoil, silting in of streams, flood damage and erosion, as well as the accumulation of pollutants that are carried into downstream water bodies. ... b.Any site distu...

Flood Zones

In the City of New Brunswick, New Jersey, anyone who intends to conduct any development in a flood hazard area must first apply to the floodplain administrator, the city engineer, and obtain the required permit. A floodplain development permit can be required in addition to the building permit, and it lapses if work does not start within 180 days.

Floodplain Development Permits in New Brunswick, NJ

Significant Restrictions

New Brunswick Municipal Code § 15.36.050

A.Permits Required. Any person, owner or authorized agent who intends to conduct any development in a flood hazard area shall first make application to the floodplain administrator and shall obtain the required permit. Depending on the nature and extent of proposed development that includes a building or structure, the floodplain administrator may determine that a floodplain development permit ...

Flood Elevation Requirements

In the City of New Brunswick, Middlesex County, New Jersey, the local design flood elevation for a delineated watercourse is the best available flood elevation plus one foot of freeboard. Zone AO sites add one foot to the FIRM depth number, and critical facilities carry more freeboard under Chapter 15.36, adopted by Ordinance O-042603 on 4-15-26.

New Brunswick NJ Flood Elevation and Freeboard Rules

Significant Restrictions

New Brunswick Municipal Code § 15.36.030

C.Establishing the Local Design Flood Elevation (LDFE). The local design flood elevation (LDFE) is established in the flood hazard areas determined in subsection B., above, using the best available flood hazard data sources, and the flood hazard area control act minimum statewide elevation requirements for lowest floors in A, coastal A, and V zones, ASCE 24 requirements for critical facilities ...