Key Facts

Freeboard, delineated watercourse
One foot above best available flood elevation
Zone AO sites
Depth number plus one foot; three feet if none printed
Class IV critical facilities
Two additional feet of freeboard
Floodplain administrator
The city engineer
Permit validity
Invalid if not started within 180 days
Cure period before fines
Thirty days, then a fine above $2,000

Summary

In the City of New Brunswick, Middlesex County, New Jersey, the local design flood elevation for a delineated watercourse is the best available flood elevation plus one foot of freeboard. Zone AO sites add one foot to the FIRM depth number, and critical facilities carry more freeboard under Chapter 15.36, adopted by Ordinance O-042603 on 4-15-26.

C.Establishing the Local Design Flood Elevation (LDFE). The local design flood elevation (LDFE) is established in the flood hazard areas determined in subsection B., above, using the best available flood hazard data sources, and the flood hazard area control act minimum statewide elevation requirements for lowest floors in A, coastal A, and V zones, ASCE 24 requirements for critical facilities as specified by the building code, plus additional freeboard as specified by this chapter. At a minimum, the local design flood elevation shall be as follows: 1.For a delineated watercourse, the elevation associated with the best available flood hazard data area determined in subsection B., above, plus one foot or as described by N.J.A.C. 7:13 of freeboard; or ... 3.AO Zones. For zone AO areas on the municipality's FIRM (or on preliminary flood elevation guidance from FEMA), the local design flood elevation is determined from the FIRM panel as the highest adjacent grade plus the depth number specified plus one foot of freeboard. If no depth number is specified, the local design flood elevation is three feet above the highest adjacent grade.

Full Breakdown

Section 15.36.030.C of the New Brunswick Municipal Code sets the local design flood elevation, or LDFE, for every flood hazard area in the City of New Brunswick. The LDFE starts from the best available flood hazard data, the state Flood Hazard Area Control Act minimum elevations for lowest floors in A, coastal A and V zones, and ASCE 24 requirements for critical facilities, then adds freeboard specified by the chapter. The chapter defines freeboard as a factor of safety expressed in feet above a flood level.

The number depends on the site. For a delineated watercourse the LDFE is the best available flood elevation plus one foot, or the freeboard N.J.A.C. 7:13 describes. For an undelineated watercourse with a contributory drainage area of fifty (50) acres or more, the applicant supplies either an unexpired NJDEP flood hazard area verification or a sealed Method 5 or Method 6 determination, each plus one foot of freeboard and any additional freeboard ASCE 24 requires. In a zone AO area the LDFE is the highest adjacent grade plus the depth number on the FIRM panel plus one foot, and three feet above the highest adjacent grade when no depth number is printed. Class IV critical facilities must meet the higher of the 0.2% annual chance flood elevation or the flood hazard area design flood elevation with two additional feet of freeboard. Class III critical facilities in coastal high hazard areas use one additional foot.

Section 15.36.150.B.1.c then requires the lowest floor of any new or substantially improved habitable building, basement included, together with attendant utilities and sanitary facilities, to sit at or above the LDFE and be confirmed by an elevation certificate. Substantial improvement means cumulative cost equal to or above fifty (50) percent of market value, reviewed over a ten-year period. The city engineer is the floodplain administrator under Section 15.36.040.A, and records the required elevation, determination method and base flood elevation source in the floodplain development permit. Under Section 15.36.070.C an elevation certificate is due when the lowest floor is placed, before further vertical construction, and again before final inspection. Section 15.36.150.G.1 puts the travel surface of any roadway or parking area in a flood hazard area at least one foot above the design elevation.

Violations & Fines

Under Section 15.36.090.A, development in a flood hazard area without a permit, or in conflict with a permit, is a violation. A building lacking documented lowest-floor elevation is presumed to be in violation until the paperwork is provided. The floodplain administrator serves notices of violation and stop work orders, and work continued after service draws penalties under N.J.S.A. 40:49-5. Owners get a thirty-day period to cure and a court hearing, after which a fine greater than two thousand dollars ($2,000.00) can be imposed.

Frequently Asked Questions

How much freeboard does a house in New Brunswick need?
For a delineated watercourse the local design flood elevation is the best available flood elevation plus one foot, or the freeboard N.J.A.C. 7:13 describes. A habitable building must then place its lowest floor, basement included, and attendant utilities at or above that elevation, confirmed by an elevation certificate. Zone AO sites add one foot to the FIRM depth number.
Who administers flood permits in the City of New Brunswick?
The city engineer is the designated floodplain administrator under Section 15.36.040.A and can delegate duties to other employees. The administrator reviews permit applications, coordinates with the construction official, and records the required elevation, determination method and base flood elevation source in the floodplain development permit. Applications are filed in writing on a form the administrator furnishes.
Can the zoning board grant a variance to build below the required elevation?
The zoning board of adjustment hears flood variance requests under Section 15.36.080. Issuance requires good and sufficient cause, exceptional hardship from physical land characteristics that leave the lot undevelopable, and a finding that the variance is the minimum necessary. The applicant is told in writing that building below base flood level raises flood insurance premiums up to twenty-five dollars ($25.00) per one hundred dollars ($100.00) of coverage.
Does a floodplain permit in New Brunswick expire?
Under Section 15.36.050.D a permit becomes invalid when development does not start within one hundred eighty (180) days after issuance, or when authorized work is suspended or abandoned for one hundred eighty (180) days. Extensions must be requested in writing with justifiable cause, and the floodplain administrator can grant one or more extensions of no more than one hundred eighty (180) days each.

Sources & Official References

Other rules in New Brunswick

All New Brunswick rules

Compare New Brunswick to another location·View the New Jersey environmental rules overview

Get notified when Flood Elevation Requirements in New Brunswick, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.