Environmental Rules in Novi, MI (2026)
5 verified environmental rules for Novi, Michigan, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
In the City of Novi, no one may discharge anything but stormwater into the storm drain system or watercourses, and illicit connections to the storm sewer are prohibited outright, even ones made before the rule existed. The code enforcement officer and director of public works administer the ban under City Code Article IV, Chapter 12.
Novi Storm Drain Discharge Ban
Some RestrictionsNovi City Code § 12-97
(a)Prohibition of illegal discharges. No person shall discharge or cause to be discharged into the storm drain system or watercourses, any materials, including, but not limited to, pollutants or waters containing any pollutants that cause or contribute to a violation of applicable water quality standards, other than stormwater. The commencement, conduct or continuance of any illegal discharge t...
Erosion Control
Novi requires a soil erosion and sedimentation control (SESC) permit before any earth change that disturbs an acre or more, or that sits within 500 feet of a lake, stream, or wetland. City Code Section 29-41 puts the Department of Building and Safety in charge, and Section 29-48 makes a knowing violation a municipal civil infraction carrying up to a $2,500 fine.
Novi Construction Erosion and Sediment Control Permit
Some RestrictionsNovi City Code §§ 29-41, 29-48(c)
(b)SESC Permit Requirements. Unless otherwise exempt by this article, Part 91, or the rules, a landowner or designated agent who contracts for, allows, or engages in, an earth change in this city shall obtain a SESC permit from the department of building and safety, which shall be kept current throughout all active earth change operations, before commencing an earth change which:(1)Disturbs one...
Flood Zones
The City of Novi identifies its regulated flood hazard areas by formally adopting FEMA's Oakland County Flood Insurance Study and a specific list of Flood Insurance Rate Map panel numbers. Section 7-24 names the study and every panel that defines where Novi's flood-resistant construction and floodplain rules apply.
Novi Flood Hazard Area Designation
Some RestrictionsNovi City Code § 7-24
The Federal Emergency Management Agency (FEMA) Flood Insurance Study (FIS) Entitled "Flood Insurance Study, Oakland County, Michigan, and Incorporated Areas" dated September 29, 2006, and the FEMA Flood Insurance Rate Maps (FIRMS) panel numbers of 26125C0457F, 26125C0488F, 26125C0489F, 26125C0493F, 26125C0606F, 26125C0607F, 26125C0608F, 26125C0609F, 26125C0620F, 26125C0626F, 26125C0627F, 26125C...
Vehicle Idling Restrictions
Between 8:00 p.m. and 7:00 a.m., Novi bars idling or standing motor vehicles within 400 feet of any residential structure for more than 15 consecutive minutes, or 15 minutes total in any hour, under City Code § 22-100. The rule targets both idling engines and occupied parked vehicles, and applies to commercial trucks as well as ordinary cars.
Novi Vehicle Idling and Standing Limits
Some RestrictionsNovi City Code § 22-100
(c)Idling, standing prohibited.(1)Between the hours of 8:00 p.m. and 7:00 a.m. (the following day), it shall be unlawful to permit, cause, or occupy any standing or idling motor vehicle or commercial vehicle within four hundred (400) feet of any residential structure, for more than fifteen (15) consecutive minutes or for a period or periods of time aggregating more than fifteen (15) minutes in ...
Flood Elevation Requirements
Every building permit issued in the City of Novi for work in a flood hazard area has to meet the flood-resistant construction rules built into the state construction code, currently printed as Appendix G of the Michigan Building Code. Section 7-23 makes compliance with that appendix mandatory and puts enforcement in the building official's hands.
Novi Flood-Resistant Construction Requirements
Some RestrictionsNovi City Code §§ 7-23, 7-25
Compliance with the flood-resistant construction provisions that are part of the construction code, currently as appendix G of the Michigan Building Code, and as amended, is required, with enforcement to be by the city enforcing agency designated in section 7-17. ... The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientif...
Looking for Oakland County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Novi city rules.
Environmental Rules in Oakland County →