Environmental Rules in Pageland, SC (2026)

2 verified environmental rules for Pageland, South Carolina, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

Every new Pageland subdivision must install an adequate storm drainage system, sized to good engineering practice and to carry all storm water in its drainage area without overloading systems upstream or downstream. Developers must connect to an accessible public storm sewer and grant the town drainage easements.

Pageland Subdivision Storm Drainage Requirements

Some Restrictions

Pageland Town Code § 30-120

An adequate storm drainage system designed to protect the proposed development from flooding shall be installed in accordance with good engineering practice. The system shall be adequate to carry all storm water in its drainage area and shall complement systems on adjacent property upstream and downstream. Where a public storm sewer is reasonably accessible, as determined by the zoning administ...

Flood Zones

Pageland's subdivision code keeps new construction out of flood-prone land: no building within 50 feet of a natural drainage way or any FEMA-designated flood-prone area, and a lot can't be approved for subdivision if more than a quarter of its area floods. Conservation lots are the only exception.

Pageland Floodplain Subdivision Construction Limits

Some Restrictions

Pageland Town Code § 30-90

A plat of a proposed subdivision submitted to the zoning administrator and public utility director for approval which contains land subject to flooding shall have such areas delineated as being subject to flooding. No new construction shall take place within 50 feet of a natural drainage way or any area so designated as a flood prone area by the Federal Emergency Management Agency. (a)A lot hav...