Solar Energy in Pageland, SC (2026)
1 verified solar energy rules for Pageland, South Carolina, sourced directly from the municipal code and official government pages.
Verified from official government sources
Panel Permits
Pageland's zoning table allows solar farm facilities only as a conditional use in the Light Industrial district, and Sec. 4-14 requires a zoning permit, sealed site plans, and a recorded decommissioning plan before one can be built.
Pageland Solar Farm Permit Process
Significant RestrictionsPageland Town Code App. A, § 4-14(A)-(B)
A.Establishment. The establishment and operation of solar farm facilities shall comply with the following design and development standards:1.Site plans shall be prepared by a licensed land surveyor, landscape architect, or engineer. Plans must be sealed. ... 3.Setbacks. All ground-mounted solar farms must be set back a minimum of 50 feet from the edge of all property lines.4.Noise levels shall ...