Pageland, SC Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing section
- § 30-120
- Standard
- Good engineering practice; no downstream overload
- Connection duty
- Connect to accessible public storm sewer
- Easement
- Required for ditches draining 2+ lots
- Enforced at
- Final plat approval (§§30-49, 30-115)
Summary
Every new Pageland subdivision must install an adequate storm drainage system, sized to good engineering practice and to carry all storm water in its drainage area without overloading systems upstream or downstream. Developers must connect to an accessible public storm sewer and grant the town drainage easements.
An adequate storm drainage system designed to protect the proposed development from flooding shall be installed in accordance with good engineering practice. The system shall be adequate to carry all storm water in its drainage area and shall complement systems on adjacent property upstream and downstream. Where a public storm sewer is reasonably accessible, as determined by the zoning administrator and public works director, the sub-divider shall connect with such drainage system. The developer shall also be required to submit to the town an easement for any drainage ditch draining more than one lot. The size of such easement shall be determined by the public works director.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 1).
Full Breakdown
Section 30-120 of the Pageland Town Code, in the subdivision regulations' Article IV on improvements, requires every subdivider to install an adequate storm drainage system designed to protect the proposed development from flooding, built in accordance with good engineering practice. The system must be sized to carry all storm water generated within its own drainage area, and it must complement, rather than overload, drainage systems already serving adjacent property both upstream and downstream. Where the zoning administrator and public works director determine that a public storm sewer is reasonably accessible, the subdivider is required to connect to it rather than building a stand-alone system.
Beyond the pipes themselves, the section requires the developer to grant the town an easement for any drainage ditch that carries runoff from more than one lot, with the public works director setting the easement's size. This dovetails with Section 30-84, which requires a storm water easement or drainage right-of-way wherever a subdivision is crossed by a watercourse, drainage way, channel or stream, sized to carry off the storm water, and with Section 30-78's design standard that every subdivision layout account for storm water management and flood damage prevention from the start.
Compliance is checked before construction is even finished: under Section 30-115, final plat approval cannot be granted until the required drainage improvements are installed, or the subdivider posts a bond, escrow deposit or letter of credit guaranteeing their completion, and Section 30-49 similarly bars recording a final plat until required improvements are installed or guaranteed.
Violations & Fines
A subdivision that lacks an adequate storm drainage system, fails to connect to an accessible public storm sewer, or omits the required drainage easements does not qualify for final plat approval under Sections 30-115 and 30-49; the town withholds recording until the system is installed or the developer posts a bond, escrow or letter of credit covering its completion.
Frequently Asked Questions
Does a Pageland developer have to build a storm drainage system for a new subdivision?
Does a new subdivision have to tie into the town's storm sewer?
When must the storm drainage system be finished?
Sources & Official References
Other rules in Pageland
Compare Pageland to another location·View the South Carolina environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.