Carbon Monoxide Detectors

Every registered vacation rental in Plantation must have a hard-wired, interconnected smoke and carbon monoxide detection system tied to the building's electrical wiring, installed and maintained to Florida Building Code Sections R314 and R315. The unit also needs a landline able to reach 911 and a 2A:10B:C fire extinguisher on every floor. The City verifies compliance at registration and renewal inspections.

Plantation Vacation Rental CO Detector Rule

Some Restrictions

Code of Ordinances § 14-214(1)(b)

(b)Smoke and Carbon Monoxide (CO) Detection and Notification System: every smoke and carbon monoxide (CO) detection and notification system must be interconnected, hard-wired, and receive primary power from the building wiring. The smoke and carbon monoxide (CO) detection and notification system must be installed and continually maintained consistent with the requirements of Section R314, Smoke...

Building Permits

Plantation declares any construction started without a building permit issued by the Building Department illegal under Code Section 5-29. The same division makes construction that departs from the use approved in an issued permit illegal too, and both violations trigger a formal notice-of-violation process, contractor license suspension, and City authority to restore the property or raze the structure.

Plantation Building Permit Requirement

Some Restrictions

Plantation, FL, Code of Ordinances § 5-29

Any construction commenced without a building permit duly issued and authorized by the Building Department is hereby declared to be illegal.

Electrical Permits

Electrical work in Plantation must comply with the Florida Building Code (Broward County), adopted citywide as the building code, and is permitted and priced separately from structural work: new residential electrical is 0.40% of total project cost, with the standard $95 minimum permit fee and a plan-review fee layered on top.

Plantation Electrical Permit Requirements

Some Restrictions

Plantation, FL, Code of Ordinances §§ 5-7, 5-9

Section 5-9 - Building Codes Adopted: The latest edition of the Florida Building Code, (Broward County), as amended, and such amendments which may be enacted, from time to time, is hereby adopted as the building code of the City. ... Table 5-1 Building Permit Fees: New Construction—Residential: Structural 0.90% of RSM/p; Electrical 0.40% of RSM/p; Plumbing 0.23% of RSM/p; Mechanical 0.16% of RS...

Plumbing Permits

Plantation adopts the Florida Building Code, (Broward County), as its building code under Section 5-9, and that code governs when a plumbing permit is required. The Building Department bills plumbing work on new residential construction at 0.23% of project cost under Section 5-7's Table 5-1, with a $95.00 citywide minimum permit fee plus a separate plan review fee.

Plantation Plumbing Permit Requirements

Some Restrictions

Plantation, FL, Code of Ordinances § 5-9

The latest edition of the Florida Building Code, (Broward County), as amended, and such amendments which may be enacted, from time to time, is hereby adopted as the building code of the City. If the State legislature chooses to enact a state-wide building code and provides that such building code be applicable to municipalities throughout the State, then such state-wide building code shall be t...