Skip to main content
CityRuleLookup

Plantation, FL Building Safety: Plumbing Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum permit fee
$95.00 citywide minimum
New-residential plumbing rate
0.23% of project cost (RSM/p)
Plan review fee
$20 plus $10 per sheet/discipline
Code adopted
Florida Building Code (Broward County)
Enforcing agency
Building Department
Fee dispute path
Written appeal to Mayor, then circuit court

Summary

Plantation adopts the Florida Building Code, (Broward County), as its building code under Section 5-9, and that code governs when a plumbing permit is required. The Building Department bills plumbing work on new residential construction at 0.23% of project cost under Section 5-7's Table 5-1, with a $95.00 citywide minimum permit fee plus a separate plan review fee.

The latest edition of the Florida Building Code, (Broward County), as amended, and such amendments which may be enacted, from time to time, is hereby adopted as the building code of the City. If the State legislature chooses to enact a state-wide building code and provides that such building code be applicable to municipalities throughout the State, then such state-wide building code shall be thereafter the building code of the City as same is, from time to time, amended.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30 Update 1).

Full Breakdown

Plantation does not run a separate local plumbing code; Section 5-9 adopts 'the latest edition of the Florida Building Code, (Broward County), as amended' as the City's building code, and the FBC Plumbing volume is what triggers a plumbing permit for water supply, drain-waste-vent work, water heaters, backflow devices and repiping. S. 5% on amounts over $1,250,000. 00 for any permit whose calculated fee would fall below that floor. 00 per sheet per discipline beyond the first sheet, covering one full review cycle of submittal, plan review, revision resubmittal and re-review; a second, non-priority review cycle costs the same fee again.

S. Means Building Construction Cost Data guide, a notarized contract copy, or the signed cost affidavit on the permit application, and any applicant who disputes the calculated fee must first seek written review from the Mayor before going to circuit court.

Violations & Fines

Plumbing work performed without the required permit and inspections is enforced through the Building Department's construction-without-a-permit process: unpermitted work can be red-tagged and the owner required to open it for inspection, and a contractor who plumbed without securing the permit and paying the Section 5-7 fee risks losing city permitting privileges until the violation is corrected. Fee disputes not resolved through the Mayor's written review under Section 5-5 must be litigated in circuit court before a permit issues.

Frequently Asked Questions

Do I need a permit to replace a water heater in Plantation?
Yes. All plumbing work in the City falls under the Florida Building Code, (Broward County), which Section 5-9 adopts as Plantation's building code, and the Building Department charges a permit fee under Section 5-7's Table 5-1, subject to a $95.00 citywide minimum, before work like a water heater swap, repiping or fixture replacement can begin.
How much does a plumbing permit cost for new home construction?
For new residential construction, Section 5-7's Table 5-1 prices plumbing at 0.23% of the project's total cost as calculated under Section 5-5 (RSM/p), subject to the $95.00 minimum fee if that calculation comes in lower, plus a separate nonrefundable plan review fee of $20.00 plus $10.00 per sheet per discipline beyond the first sheet.
Who calculates the project cost my plumbing fee is based on?
The Building Official calculates it under Section 5-5 using the current R.S. Means Building Construction Cost Data guide, a notarized copy of the contract, or the signed cost affidavit on the permit application, and any applicant who disagrees with the number must first request a written review from the Mayor before suing in circuit court.

Sources & Official References

Other rules in Plantation

All Plantation rules

Florida rules heatmap·Compare Plantation to another location·View the Florida building safety overview

Get notified when Plumbing Permits in Plantation, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Plumbing Permits in Nearby Cities

How other cities in Broward County handle plumbing permits.

Fort Lauderdale, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions