Skip to main content
CityRuleLookup

Environmental Rules in Pompano Beach, FL (2026)

5 verified environmental rules for Pompano Beach, Florida, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

Pompano Beach Code § 53.13 bars discharging anything into the city's stormwater system without written permission from the City Engineering Department, bars non-stormwater discharges outright, and bars blocking or altering any drainage course, swale, canal or ditch without city and Drainage District authorization. Every developed property also pays a monthly Stormwater Utility fee, $6.46 per equivalent residential unit for FY 2025.

Pompano Beach Stormwater Discharge Rules

Some Restrictions

Pompano Beach Code of Ordinances § 53.13

(1) Any discharge into the stormwater system of the city or drainage district without written permission from the City Engineering Department and the appropriate Drainage District. (2) Any discharge into the stormwater system of the City or Drainage District in violation of any city, federal, state, county, municipal or other governmental law, regulation or permit is prohibited, excep...

Erosion Control

Pompano Beach Code § 53.16(A) requires every construction site to maintain structural and non-structural best management practices during and after work to reduce pollutants and sediment in stormwater runoff. Sites covered by a construction NPDES permit must prove compliance, and site plans reviewed by the Building Official and City Engineer must show the specific sediment and pollutant controls before construction starts.

Pompano Beach Construction Erosion Control

Some Restrictions

Pompano Beach Code of Ordinances § 53.16(A)

(A) Construction sites and construction activities. (1) Construction sites and operations shall be required to maintain during and after all construction, development excavation or alteration operations, structural and non-structural best management practices with the intent to reduce pollutants and sediment in stormwater runoff. (2) NPDES permit requirements for construction ...

Flood Zones

Anyone starting development within Pompano Beach's flood hazard areas must first get a floodplain development permit from the Floodplain Administrator under § 152.24, separate from any Florida Building Code permit. The Flood Insurance Study for Broward County dated July 31, 2024, and its FIRM maps set the boundaries the city enforces.

Pompano Beach Floodplain Development Permits

Significant Restrictions

Pompano Beach Code of Ordinances § 152.24

Permits required. Any owner or owner's authorized agent (hereinafter "applicant") who intends to undertake any development activity within the scope of the Floodplain Regulations including buildings, structures and facilities exempt from the Florida Building Code, shall first make application to the Floodplain Administrator, and the Building Official if applicable, and shall obtain the required...

Boat Dock Permits

Building, repairing, or installing a dock, lift, or other mooring structure in Pompano Beach waterways requires an engineering permit from the City Engineer plus a building permit, with dock length and setback limits keyed to the width of the canal or waterway.

Pompano Beach Boat Dock & Mooring Permits

Significant Restrictions

Pompano Beach Code of Ordinances § 151.02

It shall be unlawful for any person to construct, repair, erect or install mooring structures, or any similar marine structures... in, over or upon the canals, waterways, rivers, or basins within the city without first obtaining an engineering permit from the City Engineer, as provided in this chapter and a building permit from the City Building Official as provided in Chapter 152.

Flood Elevation Requirements

New and substantially improved homes in Pompano Beach must have the lowest floor at or above the base flood elevation plus one foot of freeboard, or 18 inches above the crown of the adjacent street, whichever is higher, under § 152.29(C)(1). Critical facilities like hospitals and fire stations need base flood elevation plus two feet.

Pompano Beach Base Flood Elevation & Freeboard Rules

Significant Restrictions

Pompano Beach Code of Ordinances § 152.29(C)(1)

Minimum elevation. (a) Residential buildings. New construction and substantial improvement of residential buildings shall have the lowest floor, including basement, elevated to or above the base flood elevation, plus one foot or at least 18 inches above the highest point of the crown of all existing streets adjacent to the plot upon which all other buildings are located, whichever results in th...

Looking for Broward County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Pompano Beach city rules.

Environmental Rules in Broward County