Environmental Rules in Rothschild, WI (2026)
3 verified environmental rules for Rothschild, Wisconsin, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
New development in Rothschild must cut post-construction runoff pollution by 80 percent and control peak flows for the 2-, 10- and 100-year storm before a post-construction runoff permit issues from the Administrator of Public Works under Village Code Sections 590-51 and 590-52.
Rothschild Post-Construction Stormwater Rules
Some RestrictionsRothschild Village Code §§ 590-51, 590-52
Total suspended solids. BMPs shall be designed, installed and maintained to control total suspended solids carried in runoff from the post-construction site as follows: ... For new development, by design, reduce to the maximum extent practicable the total suspended solids load by 80%, based on the average annual rainfall, as compared to no runoff management controls. No responsible party/person...
Erosion Control
Rothschild requires an approved erosion and sediment control plan and a permit from the Administrator of Public Works before any land disturbing activity of an acre or more begins, with weekly BMP inspections during construction, under Village Code Sections 590-47 and 590-48.
Rothschild Construction Erosion Control Rules
Some RestrictionsRothschild Village Code §§ 590-47, 590-48
The responsible party shall implement an erosion and sediment control plan developed in accordance with § 590-49 that incorporates the requirements of this section. ... A written plan shall be developed in accordance with § 590-49A and implemented for each construction site. ... The plan required under Subsection B shall include requirements in accordance with § NR 151.11(6), Wis. Adm. Code. .....
Flood Elevation Requirements
In Rothschild's floodfringe zoning district, new homes and substantial home improvements must have their lowest floor built up on fill to or above the flood protection elevation, defined as two feet of freeboard above the regional flood elevation. Surrounding fill must extend at least 15 feet beyond the structure. The Village Floodplain Administrator enforces the standard through the floodplain development permit.
Rothschild Flood Protection Elevation Rule
Some RestrictionsRothschild Village Code §§ 572-4, 572-10
§ 572-4. Floodfringe District (FF). ... (a) A ... ll new construction, including placement of manufactured homes, and substantial improvement of residential structures, shall have the lowest floor elevated to or above the flood protection elevation on fill. The fill around the structure shall be one foot or more above the regional flood elevation extending at least 15 feet beyond the limits of ...
Looking for Marathon County county-wide rules?
County ordinances apply to unincorporated areas and may supplement Rothschild city rules.
Environmental Rules in Marathon County →