Skip to main content
CityRuleLookup

Environmental Rules in Salinas, CA (2026)

5 verified environmental rules for Salinas, California, sourced directly from the municipal code and official government pages.

Verified from official government sources

Stormwater Management

Salinas bars any non-stormwater discharge into its municipal storm drain system under Municipal Code Chapter 29, enforced by the city engineer to meet the city's NPDES permit and the federal Clean Water Act. New development and significant redevelopment must use low-impact-development design and file a stormwater control plan, and illegal discharges or illicit connections are misdemeanors punishable under state-law fine limits plus city abatement costs.

Salinas Stormwater Discharge & Drainage Rules

Some Restrictions

Salinas, CA, Municipal Code Sec. 29-9

Nonstormwater discharges to the city storm drain system are prohibited, except as specifically allowed in Section 29-10. No person shall contribute or cause to be contributed, directly or indirectly, to the city's storm drainage system any pollutant, wastewater or any substance or material which will interfere with the operation or performance of the storm drainage system, violate the city's NP...

Erosion Control

Every construction site in Salinas must follow the city's Standards to Control Excavations, Cuts, Fills, Clearing, Grading, Erosion and Sediments and keep debris and dirt out of the storm drain system. The authorized enforcement officer can force a stormwater pollution prevention plan before final map or building permit approval.

Salinas Construction Erosion & Sediment Control

Some Restrictions

Salinas, CA, Municipal Code Sec. 29-15(d) (Reduction of Pollutants in Stormwater, Construction Site BMPs)

Best Management Practices for Construction Sites. All construction shall comply with the city of Salinas Standards to Control Excavations, Cuts, Fills, Clearing, Grading, Erosion and Sediments, as adopted by the city council and as the same may be amended from time to time. Any construction contractor performing work in the city shall keep debris and dirt out of the city's storm drain system. T...

Coastal Development

Salinas regulates development in coastal zones through setback requirements, habitat protections, and public access mandates. State coastal commission approval may be required for projects near the shoreline.

Salinas Coastal Development Rules

Some Restrictions

California Coastal Commission — Coastal Zone Boundary (Cal. Pub. Resources Code Sec. 30103; Coastal Act of 1976)

Public Resources Code (PRC) Section 30103(a) specifically defines California's Coastal Zone as that land and water area of the State of California from the Oregon border to the border of the Republic of Mexico depicted on maps identified and set forth in Section 17 of that chapter of the Statutes of the 1975-76 Regular Session enacting PRC Division 20 (the Coastal Act of 1976). PRC Section 3010...

Flood Zones

Salinas requires a floodplain development permit before any construction, fill, grading, or land-disturbing work begins in a mapped special flood hazard area. The city engineer, serving as floodplain administrator, reviews site plans against FEMA's 1981 Flood Insurance Study and Flood Insurance Rate Maps on file at the Permit Center. Building without this permit is a misdemeanor, and the administrator can suspend or revoke permits issued on inaccurate information.

Salinas Floodplain Development Permit Rules

Some Restrictions

Salinas, CA, Municipal Code Sec. 9-06.23 (Permit Required)

Any person, owner or authorized agent who intends to conduct any development in a flood hazard area shall first make application to the Floodplain Administrator and shall obtain the required permit for floodplain development. No permit shall be issued until compliance with the requirements of these regulations and all other applicable codes and regulations has been satisfied. No building permit...

Flood Elevation Requirements

New construction and substantial improvements in a Salinas special flood hazard area must have their lowest floor, including any basement, elevated at least two feet above the base flood elevation. In approximate Zone AO, elevation must clear the mapped depth number by two feet, or sit two feet above the highest adjacent grade if no depth number is shown. A licensed engineer or surveyor must certify the finished elevation.

Salinas Base Flood Elevation Freeboard Rule

Some Restrictions

Salinas, CA, Municipal Code Sec. 9-06.34(c)(1) (Elevation and Floodproofing)

(c)Elevation and Floodproofing.(1)Residential construction, new construction or substantial improvement of any structure shall have the lowest floor, including basement, elevated as follows:(A)In an AO Zone, elevated above the highest adjacent grade to a height exceeding the depth number specified in feet on the FIRM by two feet, or elevated at least two feet above the highest adjacent grade if...

Looking for Monterey County county-wide rules?

County ordinances apply to unincorporated areas and may supplement Salinas city rules.

Environmental Rules in Monterey County