Environmental Rules in Youngstown, OH (2026)
4 verified environmental rules for Youngstown, Ohio, sourced directly from the municipal code and official government pages.
Verified from official government sources
Stormwater Management
In the City of Youngstown, Ohio, anyone building, altering, or relocating a storm sewer, natural watercourse, or other drainage facility needs a Site Grading and Development permit from the Public Works Department. Chapter 950's Comprehensive Stormwater Management rules set design standards and fees, and violators face misdemeanor penalties.
Youngstown Stormwater Permit Rules
Some RestrictionsYoungstown Codified Ordinances §§ 950.07, 950.99
950.07 PERMITS, FEES AND PLAN REVIEW PROCESS. ... (a) Permits. It shall be unlawful for any person or organization to construct, enlarge, alter, repair, relocate, or demolish a storm sewer, natural watercourse, or other drainage facilities without first filing an application and obtaining a proper Site Grading and Development permit from the Public Works Department and paying the prescribed fee...
Erosion Control
Construction projects that disturb an acre or more of land in the City of Youngstown, Ohio must have a Stormwater Pollution Prevention Plan approved by the Public Works Department before grading starts. Chapter 952 requires a scaled-down Abbreviated SWP3 for sites disturbing as little as one-tenth of an acre, and escalating fines apply when erosion controls are not maintained.
Youngstown Erosion & Sediment Control Permit
Some RestrictionsYoungstown Codified Ordinances §§ 952.05, 952.13, 952.99
This regulation requires that a Storm Water Pollution Prevention Plan (SWP3) be developed and implemented for all soil disturbing activities disturbing one (1) or more acres of total land, or less than one (1) acre if part of a larger common plan of development or sale disturbing one (1) or more acres of total land. ... (e) Failure to maintain and repair erosion and sediment controls per the ap...
Flood Zones
In the City of Youngstown, Ohio, any construction, filling, grading, or watercourse alteration in a special flood hazard area requires a floodplain development permit from the Floodplain Administrator before work begins. Youngstown Codified Ordinances Chapter 1305 also sets elevation requirements for new residential construction and makes violations a criminal offense.
Youngstown Floodplain Development Permit Rules
Significant RestrictionsYoungstown Codified Ordinances §§ 1305.14, 1305.26(d), 1305.99
It shall be unlawful for any person to begin construction or other development activity including but not limited to filling; grading; construction; alteration, remodeling, or expanding any structure; or alteration of any watercourse wholly within, partially within or in contact with any identified special flood hazard area, as established in Section 1305.06, until a floodplain development perm...
Flood Elevation Requirements
In the City of Youngstown, Ohio, new construction and substantial improvements in a special flood hazard area must have the lowest floor, including the basement, elevated to or above the flood protection elevation, which is the base flood elevation plus one foot of freeboard under Youngstown Codified Ordinances Chapter 1305. The Chief Building Official administers the rule as the city's Floodplain Administrator.
Youngstown Base Flood Elevation & Freeboard
Some RestrictionsYoungstown Codified Ordinances §§ 1305.11(16), 1305.26
1305.26 RESIDENTIAL STRUCTURES. ... (a) New construction and substantial improvements shall be anchored to prevent flotation, collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic loads, including the effects of buoyancy. ... (d) New construction and substantial improvement of any residential structure, including manufactured homes, shall have the lowest flo...