Cass County, MO Data Centers & Crypto Mining: Data Center Noise Limits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Property-line noise limit
50 dBC
Sensitive-use threshold
Within 500 feet of homes, schools, churches
Generator test hours
Prohibited 9:00 PM to 7:00 AM
Generator test frequency
No more than once per week, 2 hrs max
Compliance proof
PE-stamped sound affidavit before occupancy

Summary

Data centers, generators and substations in unincorporated Cass County must keep sound pressure levels at or under 50 dBC measured at the property line, with a tighter obligation near homes, churches, daycares and schools, plus a licensed engineer's on-site sound affidavit before occupancy.

These county ordinances apply to unincorporated areas of Cass County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

a. A greater setback may be required so that the SPL attributable to infrastructure of the data center property shall not exceed fifty (50) dBC at the subject property lines. ... d. ... The SPL attributable to infrastructure of the data center property shall not exceed fifty (50) dBC, as measured at all data center property line. For data centers located within five hundred (500) feet of any allowed residential use or district, place of worship, daycare, park, lodging establishment ... and educational facilities, the SPL attributable to the facility shall not exceed fifty (50) dBC at all data center property line. ... 16. ... Sound/Noise Requirements. All requirements relating to noise and noise disturbance shall be considered for data centers. a. On-Site Monitoring Of Sound. The permit holder shall provide to the County, prior to the issuance of a certificate of occupancy or completion, an affidavit that includes the following information

Full Breakdown

662(E)(5)(a) ties the facility's setback directly to noise: a greater setback than the base 1,000 feet may be required so that sound pressure level (SPL) attributable to data center infrastructure does not exceed 50 dBC at the subject property lines. Subsection E(10)(d), covering generators, restates the same 50 dBC ceiling measured at all data center property lines, and adds a stricter trigger for sensitive neighbors: where the facility sits within 500 feet of any allowed residential use or district, a place of worship, daycare, park, lodging establishment (including bed and breakfast, campground, RV park, hotel, motel, nightly rental or timeshare unit), or an educational facility, the SPL attributable to the facility still cannot exceed 50 dBC at the property line.

Substations carry the identical 50 dBC limit under Subsection E(8)(c). , and no more than once per week, and outdoor generators need a concrete sound barrier extending at least two feet above the unit or ten feet high, whichever is greater. Subsection E(16) requires the permit holder to submit an on-site sound monitoring affidavit to the county before a certificate of occupancy issues, wet-stamped by a Missouri-licensed professional engineer, listing equipment, NIST-traceable calibration certificates, measurement locations at each property line, SPL readings, and a guarantee the facility will never run louder than what was measured; the county can independently verify readings.

Violations & Fines

Exceeding 50 dBC at the property line, or at the 500-foot threshold near residential, worship, daycare, park, lodging or school uses, violates Section 400.662(E)(10)(d); testing generators outside the 9:00 p.m. to 7:00 a.m. curfew, running tests longer than two hours a day, or testing more than once a week violates Section 400.662(E)(10)(a)-(b). Failing to file the required wet-stamped sound monitoring affidavit before occupancy is also a compliance failure the Zoning and Codes Department can act on.

Frequently Asked Questions

What is the maximum noise level for a data center in Cass County?
Section 400.662(E)(10)(d) sets a 50 dBC sound pressure level ceiling measured at the data center property line, and the same 50 dBC limit applies at the property line even when the facility sits within 500 feet of a residential use, church, daycare, park, lodging use or school.
Can data center generators run at night in unincorporated Cass County?
No. Section 400.662(E)(10)(a) prohibits testing generators between 9:00 p.m. and 7:00 a.m., limits any test to two hours per day, and Subsection (b) allows testing no more than once per week.
Who verifies a data center's noise compliance?
Section 400.662(E)(16) requires the permit holder to submit an affidavit before a certificate of occupancy issues, prepared and wet-stamped by a Missouri-licensed professional engineer, documenting equipment, calibration, measurement points at each property line, and SPL readings; the county may require independent verification.

Sources & Official References

Other rules in Cass County

All Cass County rules

Compare Cass County to another location·View the Missouri data centers & crypto mining overview

Get notified when Data Center Noise Limits in Cass County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.