Cass County, MO Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Special use permit (SUP)
Maximum site size
1,000 acres unless BZA modifies
Maximum lot coverage
60% of parcel
Maximum height
40 feet from adjacent grade
Enforcing department
Zoning and Codes Department

Summary

A data center in unincorporated Cass County needs a special use permit and cannot exceed 1,000 acres, 60% lot coverage, or 40 feet in height. Battery storage, generators and substations built on the same site face their own siting rules under the same permit.

These county ordinances apply to unincorporated areas of Cass County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

C. Required Approvals. A special use permit is required for a data center and/or battery energy storage system/battery storage facility. Any proposed expansion of such facilities will require approval of a new special use permit. ... 2. Size. ... In order to maintain the rural character and preserve agricultural land the data center site shall: a. Be limited to no more than one thousand (1,000) acres total, unless the BZA approves a modification from this standard b. ... Have a maximum of sixty percent (60%) coverage of the lot/parcel of land in which it is located on ... 7. Height. ... Data center and any appurtenant equipment shall not exceed forty (40) feet in height, measured from adjacent grade; including any roof-mounted mechanical equipment

Full Breakdown

662 governs data centers countywide in the unincorporated area. Subsection C requires a special use permit (SUP) for any data center or battery energy storage system, and any later expansion of the site area or accessory equipment area triggers a new SUP application rather than an administrative amendment. Subsection E sets numeric development standards meant to preserve the county's rural and agricultural character: the site is capped at 1,000 acres total unless the Board of Zoning Adjustment approves a modification based on site-specific characteristics tied to preserving rural character, natural features, or shared agricultural use, and lot coverage from all hard surfaces, structures and appurtenant equipment cannot exceed 60% of the parcel.

Structures and equipment are capped at 40 feet in height measured from adjacent grade, including roof-mounted mechanical equipment, though the BZA may approve additional height to accommodate slopes without grading or added screening if it will not harm nearby land uses. Location standards steer siting away from prime farmland disturbance, steep slopes of 15% or more, and environmentally sensitive lands such as floodways and wetlands, and push applicants toward brownfield sites and screening from off-site view. A primary structure is required before installing a standalone modular data center (SMDC), and every SMDC must be screened with landscaping, opaque fencing, or a decorative wall at least as tall as the SMDC; chain-link screening is not allowed.

Applications go to the Zoning and Codes Department, and the review considers visual impact, wildlife habitat, cultural and historical features, infrastructure impact, aviation/FAA concerns, and the applicant's decommissioning and bonding plan.

Violations & Fines

Operating a data center, battery storage system, generator, or substation in unincorporated Cass County without an approved special use permit, or expanding a permitted facility's site area or accessory equipment footprint without first obtaining a new SUP, is a code violation the Zoning and Codes Department enforces. Exceeding the 1,000-acre cap or 60% lot coverage standard without a BZA-approved modification, or building taller than 40 feet without an approved height modification, puts the facility out of compliance with its permit conditions.

Frequently Asked Questions

Can I build a data center in unincorporated Cass County by right?
No. Section 400.662(C) requires a special use permit for any data center or battery energy storage system before construction, and expanding an existing site's footprint or accessory equipment area requires a new SUP application rather than an administrative sign-off.
How large can a data center site be in unincorporated Cass County?
Section 400.662(E)(2) caps the site at 1,000 acres total and 60% lot coverage from structures, hard surfaces and equipment, unless the Board of Zoning Adjustment approves a modification tied to preserving rural character, natural features, or shared agricultural use of the property.
How tall can data center structures be?
Section 400.662(E)(7) limits data center structures and appurtenant equipment, including roof-mounted mechanical equipment, to 40 feet measured from adjacent grade, though the BZA can approve added height to handle slopes or screening needs without harming nearby land uses.

Sources & Official References

Other rules in Cass County

All Cass County rules

Compare Cass County to another location·View the Missouri data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Cass County, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.