Key Facts
- Pre-approval study
- Environmental Noise Impact Assessment required
- Qualified preparer
- ASA, INCE, or NCAC member
- Follow-up study
- 12 months after CO, then every 5 years
- Meter standard
- Type 1/2 meter, ANSI S1.4:2014
- Measurement point
- Property boundary
Summary
In Frederick County outside Winchester, Stephens City and Middletown, a data center rezoning or conditional use permit application must include an Environmental Noise Impact Assessment from a certified acoustical professional under § 165-705.01.A(5)(a), and the operator must repeat a certified noise study 12 months after occupancy and every five years afterward under A(5)(b).
(5) Noise and noise monitoring. (a) The applicant shall submit an Environmental Noise Impact Assessment prepared by a qualified full member of the Acoustical Society of America (ASA), a member of the Institute of Noise Control Engineering (INCE), or a member of the National Association of Acoustical Consultants (NCAC). The purpose of such noise impact assessment, modeled in SoundPLAN, CadnaA®, or accepted equivalent, shall model anticipated noise levels as a result of facility operation and establish a baseline noise level prior to approval of a rezoning or CUP. (b) A noise study certifying noise levels shall be conducted 12 months after the issuance of the first certificate of occupancy (CO) and every five years thereafter. Each noise study shall be submitted for review to the Zoning Administrator and/or his/her designee to assess the actual impact of the completed project.
Full Breakdown
Frederick County built its data center noise-control standard around a two-stage study requirement rather than a single numeric decibel ceiling in the text itself. A(5)(a) requires the applicant to submit an Environmental Noise Impact Assessment prepared by a qualified full member of the Acoustical Society of America, a member of the Institute of Noise Control Engineering, or a member of the National Association of Acoustical Consultants. The assessment must be modeled in SoundPLAN, CadnaA, or an accepted equivalent, must model anticipated noise levels from the facility's operation, and must establish a baseline noise level before the rezoning or CUP is approved, giving the County a documented benchmark before construction begins.
Subsection A(5)(b) then requires a second, post-construction noise study certifying actual noise levels 12 months after the first certificate of occupancy issues, and again every five years after that for the life of the facility, with every study submitted to the Zoning Administrator for review of the completed project's real-world impact. 4:2014, a minimum of three readings are averaged, three decibels are subtracted when background noise equals the section's limiting levels, and measurements are taken at the property boundary. If a post-construction study exceeds the maximum noise level permitted, the operator must add mitigation strategies, improvements, or operational changes, and any later addition, alteration or expansion of the facility triggers a fresh noise impact assessment before the Zoning Administrator can approve it.
Violations & Fines
A data center that skips the required Environmental Noise Impact Assessment before rezoning or CUP approval, or fails to file the 12-month and five-year follow-up noise studies, is out of compliance with its CUP conditions and § 165-705.01, enforceable by the Zoning Administrator under § 165-204.04; an uncorrected violation is a misdemeanor punishable by a fine of $10 to $1,000 per offense.
Frequently Asked Questions
Does Frederick County require a noise study before a data center is approved?
Does a Frederick County data center get checked for noise after it opens?
What happens if a Frederick County data center exceeds its permitted noise level?
Sources & Official References
Other rules in Frederick County
Compare Frederick County to another location·View the Virginia data centers & crypto mining overview