Broomfield, CO Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)

Few Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permitted by right in
MU-2 district only
Max building height
60 feet
Front yard
10 to 25 feet
Rear yard
10 feet minimum, no max
Outdoor storage cap
10% of lot area

Summary

Broomfield allows data centers by right in the MU-2 Employment Mixed Use District under section 17-23.1-020(G), with no special review or conditional use hearing required. The use must still meet MU-2's general development standards for height, setbacks, and screening under section 17-23.1-040.

17-23.1-020 - Permitted uses; by right. The following uses are permitted by right in the MU-2 district:

(A)Assembly processing, treatment, storage, or packaging of products from previously prepared materials such as food, beverages, appliances, electronics, furniture, business machines, and pharmaceuticals;(B)Banks, savings and loan, and finance companies;(C)Breweries, brewpubs, wineries and distilleries with tasting rooms;(D)Commercial recreational uses and theaters, indoor;(E)Commercial recreational uses, outdoor;(F)Commercial services such as plumbing, bakery, food catering, household equipment, and appliance rental and repairs;(G)Data centers; ...

Full Breakdown

Section 17-23.1-020 lists data centers among the by-right uses in the MU-2 Employment Mixed Use District, alongside hospitals, flex office and flex industrial space, warehouse distribution, and manufacturing of medical and pharmaceutical supplies. No other Broomfield zone district printed in this code names data centers as a listed use, so MU-2 is the only district where the use is confirmed by right rather than requiring a rezoning or a specific-use amendment. A data center sited in MU-2 must still meet the district's general development standards under section 17-23.1-040: a maximum building height of sixty feet, stepped down when adjacent to low-density residential zoning so that portions within fifty feet of that property line do not exceed the residential district's own height cap, and setbacks ranging from a 10-to-25-foot front yard, an 8-to-15-foot interior side yard, and a 10-foot minimum rear yard with no maximum.

Outdoor equipment or storage tied to a data center's operations, such as backup generators or cooling equipment, is permitted under section 17-23.1-020(Q) as outdoor parking of service vehicles or under section 17-23.1-020(R) for outdoor storage limited to no more than 10% of the lot area and screened by a fence or wall meeting section 17-32-140. Exceeding that 10% storage threshold moves the use into the special review category under section 17-23.1-030(A).

Violations & Fines

Operating a data center's outdoor storage or equipment beyond MU-2's 10%-of-lot-area cap without special review approval is a zoning violation under chapter 17-50: the building official can order it corrected under section 17-50-040, and noncompliance within ten days is a misdemeanor under section 17-50-050, carrying the chapter 1-12 penalty of up to $2,650 or 364 days in jail.

Frequently Asked Questions

Where in Broomfield can a data center be built by right?
Section 17-23.1-020(G) lists data centers as a permitted-by-right use in the MU-2 Employment Mixed Use District only. No other zone district in the Broomfield Municipal Code names data centers as a listed use, so any other location would need a rezoning.
How tall can a data center be in Broomfield's MU-2 district?
Section 17-23.1-040(A) caps MU-2 building height at sixty feet, but portions of the building within fifty feet of low-density residential zoned property must step down to that residential district's own height limit rather than reaching the full sixty-foot ceiling allowed elsewhere on the site.
Can a data center store backup generators or cooling equipment outdoors?
Yes, up to a limit. Section 17-23.1-020(R) allows outdoor storage of equipment used with the principal use, capped at 10% of the lot area and enclosed and screened by a fence or wall meeting section 17-32-140. Exceeding 10% pushes the storage into the special review category under section 17-23.1-030(A).
What setbacks apply to a data center in the MU-2 district?
Section 17-23.1-040(B) sets a front yard of 10 to 25 feet, an interior side yard of 8 to 15 feet, a street-side or exterior side yard of 10 to 25 feet, and a rear yard with a 10-foot minimum and no maximum limit.

Sources & Official References

Other rules in Broomfield

All Broomfield rules

Compare Broomfield to another location·View the Colorado data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Broomfield, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.