Key Facts
- Permitted by right in
- MU-2 district only
- Max building height
- 60 feet
- Front yard
- 10 to 25 feet
- Rear yard
- 10 feet minimum, no max
- Outdoor storage cap
- 10% of lot area
Summary
Broomfield allows data centers by right in the MU-2 Employment Mixed Use District under section 17-23.1-020(G), with no special review or conditional use hearing required. The use must still meet MU-2's general development standards for height, setbacks, and screening under section 17-23.1-040.
17-23.1-020 - Permitted uses; by right. The following uses are permitted by right in the MU-2 district:
(A)Assembly processing, treatment, storage, or packaging of products from previously prepared materials such as food, beverages, appliances, electronics, furniture, business machines, and pharmaceuticals;(B)Banks, savings and loan, and finance companies;(C)Breweries, brewpubs, wineries and distilleries with tasting rooms;(D)Commercial recreational uses and theaters, indoor;(E)Commercial recreational uses, outdoor;(F)Commercial services such as plumbing, bakery, food catering, household equipment, and appliance rental and repairs;(G)Data centers; ...
Full Breakdown
Section 17-23.1-020 lists data centers among the by-right uses in the MU-2 Employment Mixed Use District, alongside hospitals, flex office and flex industrial space, warehouse distribution, and manufacturing of medical and pharmaceutical supplies. No other Broomfield zone district printed in this code names data centers as a listed use, so MU-2 is the only district where the use is confirmed by right rather than requiring a rezoning or a specific-use amendment. A data center sited in MU-2 must still meet the district's general development standards under section 17-23.1-040: a maximum building height of sixty feet, stepped down when adjacent to low-density residential zoning so that portions within fifty feet of that property line do not exceed the residential district's own height cap, and setbacks ranging from a 10-to-25-foot front yard, an 8-to-15-foot interior side yard, and a 10-foot minimum rear yard with no maximum.
Outdoor equipment or storage tied to a data center's operations, such as backup generators or cooling equipment, is permitted under section 17-23.1-020(Q) as outdoor parking of service vehicles or under section 17-23.1-020(R) for outdoor storage limited to no more than 10% of the lot area and screened by a fence or wall meeting section 17-32-140. Exceeding that 10% storage threshold moves the use into the special review category under section 17-23.1-030(A).
Violations & Fines
Operating a data center's outdoor storage or equipment beyond MU-2's 10%-of-lot-area cap without special review approval is a zoning violation under chapter 17-50: the building official can order it corrected under section 17-50-040, and noncompliance within ten days is a misdemeanor under section 17-50-050, carrying the chapter 1-12 penalty of up to $2,650 or 364 days in jail.
Frequently Asked Questions
Where in Broomfield can a data center be built by right?
How tall can a data center be in Broomfield's MU-2 district?
Can a data center store backup generators or cooling equipment outdoors?
What setbacks apply to a data center in the MU-2 district?
Sources & Official References
Other rules in Broomfield
Compare Broomfield to another location·View the Colorado data centers & crypto mining overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.