Provo, UT Data Centers & Crypto Mining: Data Center Zoning & Siting (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Allowed base zones
Light Manufacturing (M1) or PIC only
Buffer distance
200 feet from school, park, home
Cooling requirement
Non-evaporative; no sewer discharge
Financial safeguard
Performance bond per UMPA policy
Noise standard
Must meet Code Section 9.06.040
Enacted
Ordinance 2025-53, amended 2026-13

Summary

Provo confines data centers to a DC Overlay Zone that can only be layered onto Light Manufacturing (M1) or Planned Industrial Commercial (PIC) land, requires a 200-foot buffer from schools, parks and homes, and forces non-evaporative cooling with zero cooling-water discharge to city sewers.

(1) The DC Overlay may only be combined with Light Manufacturing (M1) and Planned Industrial Commercial (PIC) Zones. Development within the DC Overlay must comply with the development standards of the underlying zone unless otherwise specified in this Chapter... (3) No data center may be located closer than two hundred (200) feet to any school, park, or residential property, measured in a straight line between the closest property lines of lots on which the respective uses are located... (5) Data centers must use non-evaporative cooling methods and may not discharge treated water used for cooling into the municipal systems.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-17, passed June 9, 2026).

Full Breakdown

34A creates the Data Center Overlay Zone (DC Overlay) specifically to control the environmental footprint of server farms on air quality, water use and energy demand. 050(1), the overlay may only be combined with the Light Manufacturing (M1) or Planned Industrial Commercial (PIC) base zones, and any development must still meet the underlying zone's standards unless this chapter says otherwise. 100 before it can be approved. 050(3) sets a hard 200-foot separation: no data center may sit closer than two hundred feet to any school, park, or residential property, measured straight-line between the nearest lot lines.

050(5) requires non-evaporative cooling methods and bars discharging treated cooling water into the municipal water system. Data centers must also post a performance bond or similar financial mechanism under UMPA data center policies to protect taxpayers from infrastructure risk. 5, PM10, methane and more), and a technology end-of-life plan requiring disposal through a DEQ-licensed e-waste recycler. 040. 310. The chapter was enacted by Ordinance 2025-53 and amended by Ordinance 2026-13.

Violations & Fines

The overlay is administered through the city's zone map amendment and project plan approval process rather than a simple staff permit, so a data center proposed outside M1 or PIC, inside the 200-foot buffer, or without the required application package can be denied outright by the Municipal Council. Noncompliant cooling discharge or noise levels are enforced under the referenced Building, Fire and noise chapters, and an incomplete community benefit plan or environmental review under 14.34A.050(6) is grounds to reject the application before it reaches a vote.

Frequently Asked Questions

Can a data center be built anywhere in Provo?
No. Provo City Code 14.34A.050(1) limits the Data Center Overlay to sites already zoned Light Manufacturing (M1) or Planned Industrial Commercial (PIC). It cannot be layered onto residential, commercial or other industrial base zones, so a rezone request outside those two districts fails automatically.
How far must a data center be from homes or schools?
Section 14.34A.050(3) requires at least 200 feet between the data center's property line and the nearest property line of any school, park, or residential property, measured in a straight line between the closest lot lines of each use.
What cooling methods are allowed?
Section 14.34A.050(5) requires non-evaporative cooling systems and prohibits discharging any treated cooling water into Provo's municipal water or sewer systems, pushing operators toward closed-loop or air-cooled designs.
What must an applicant submit besides a site plan?
Section 14.34A.050(6) requires a phasing narrative, legal entity disclosures, a community benefit plan, a UMPA infrastructure compensation agreement, a power load plan, vibration and environmental impact reviews, a pollutant estimate, and an e-waste end-of-life plan.

Sources & Official References

Other rules in Provo

All Provo rules

Compare Provo to another location·View the Utah data centers & crypto mining overview

Get notified when Data Center Zoning & Siting in Provo, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.