Chelsea, MA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Chelsea Code of Ordinances Sec. 30-220(2)
Trigger
Any construction project in the city
Reviewing agency
Department of Public Works, director
Consequence of no plan
Building permit withheld entirely
First-offense fine
$50.00
Third-offense fine
$300.00

Summary

Chelsea requires every construction project to submit a sediment and erosion control plan to the Department of Public Works before it can get a building permit. Code of Ordinances Sec. 30-220(2) blocks permit issuance entirely until the director signs off on the plan, folding stormwater and drainage management into the same review.

(2)The proponents of all construction projects within the city must submit to DPW for approval a plan to manage sediment and erosion control, which includes stormwater and drainage, at the proposed location prior to or in conjunction with its building permit application. No building permits shall be approved and issued until such plan has been approved by the director.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 26).

Full Breakdown

Sec. 30-220, Pollution prevention in the stormwater collection system, sits in the storm drains division of Chelsea's water and sewer chapter and ties directly into the city's small MS4 stormwater permit. Paragraph (2) requires the proponent of any construction project in the city to submit a plan to the DPW that manages sediment and erosion control, including stormwater and drainage, before or together with the building permit application, and the plan must be approved by the director before any building permits are approved and issued.

The same section separately requires proponents of development and redevelopment projects to submit a post-construction runoff management plan before occupancy is granted, addressing low impact development principles such as preserving natural areas, protecting tree cover and riparian buffers, limiting land disturbance and new impervious surface, and promoting vegetative stormwater controls and infiltration; an applicant who does not use LID practices must explain why. Paragraph (1) of the same section separately bans nonstormwater discharges to the city's small MS4 system under the illicit discharge detection and elimination plan, and gives a property owner seven days to comply with a director's order to stop such a discharge before the city acts and bills the owner for the cost.

The erosion and sediment plan requirement is reinforced by Sec. 30-223(b)(2), which requires an owner making a new or modified connection to the public drain to prepare and implement an erosion and sedimentation control plan to prevent soil erosion and sediment from reaching the public sewers and drains during and after construction. Violations of the chapter 30 water and sewer rules, including this permitting condition, are punishable under the chapter's noncriminal disposition schedule, enforced by DPW personnel or police officers.

Violations & Fines

Violating the chapter 30 water and sewer provisions, including the sediment and erosion control plan requirement, carries a $50.00 fine for a first offense, $150.00 for a second and $300.00 for a third, enforced through noncriminal disposition by Public Works department personnel, a designee, or police officers under the general penalty schedule at Sec. 1-8(c). Building permits are also withheld outright until DPW approves the plan.

Frequently Asked Questions

Do I need an erosion control plan to build in Chelsea?
Yes. Sec. 30-220(2) requires every construction project's proponent to submit a sediment and erosion control plan, covering stormwater and drainage, to the DPW before or with the building permit application. The building permit cannot be issued until the director approves that plan, so the requirement applies to essentially all new construction in the city.
What happens if I skip Chelsea's sediment control plan?
Without an approved plan, the building permit itself will not be issued, since Sec. 30-220(2) makes DPW approval a precondition. If work proceeds without one and a violation is found, chapter 30's penalty schedule applies: $50.00 for a first offense, $150.00 for a second, and $300.00 for a third.
Does Chelsea's erosion plan also cover stormwater after construction?
Yes. The same Sec. 30-220 requires developers to submit a post-construction runoff management plan before occupancy, built around low impact development principles like limiting impervious surface and promoting infiltration, and Sec. 30-223(b)(2) separately requires an erosion and sedimentation control plan for new or modified drain connections.

Sources & Official References

Other rules in Chelsea

All Chelsea rules

Compare Chelsea to another location·View the Massachusetts environmental rules overview

Get notified when Erosion Control in Chelsea, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.