Fall River, MA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
1+ acre land disturbance
Permitting body
Site Plan Review Committee
Application filing
3 copies, plus abutters list
Max fine
$300 per day

Summary

Clearing, grading, or excavating one acre or more that drains to Fall River's storm sewer system requires a stormwater management permit from the Site Plan Review Committee before work starts.

No person may undertake a construction activity, including clearing, grading and excavation that results in a land disturbance that will disturb equal to or greater than one acre of land or will disturb less than one acre of land but is part of a larger common plan of development or sale that will ultimately disturb equal to or greater than one acre of land draining to the Fall River municipal separate storm sewer system without a permit from the Site Plan Review Committee. Construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity or the original purpose of the site.

B. Exemptions. The following activities are exempt from this Division 6:

(1) Normal maintenance and improvement of land in agricultural use as defined by the Wetlands Protection Act regulation 310 CMR 10.04;

(2) Maintenance of existing landscaping, gardens or lawn areas associated with a single-family dwelling;

(3) The construction of fencing that will not substantially alter existing terrain or drainage patterns;

(4) Construction or maintenance and repair of utilities other than drainage (gas, water, electric, telephone, etc.) which will not alter terrain or drainage patterns;

(5)

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4739915; v14 updated 2025-12-23; through 12-23-2025).

Full Breakdown

Under Fall River's stormwater ordinance (Chapter 74, Division 6), clearing, grading, or excavating that disturbs an acre or more of land draining to the City's storm sewer system needs a stormwater management permit from the Site Plan Review Committee before any site work starts: smaller phases of a larger one-acre-plus development count too. The application (§ 74-149) requires a stormwater management plan, an erosion and sediment control plan, an operation and maintenance plan, an abutters list, and review fees. Exemptions cover routine agricultural land maintenance, existing residential landscaping, and work already under Conservation Commission wetlands jurisdiction.

Violations & Fines

Grading or clearing an acre-plus site without a stormwater permit violates Division 6; § 74-157 allows a stop-work order plus fines up to $300 per day, or a tiered $100/$200/$300 noncriminal penalty per violation.

Frequently Asked Questions

Do I need a permit to grade less than an acre in Fall River?
Only if it's part of a larger common plan of development that will ultimately disturb an acre or more; smaller standalone projects fall outside this specific stormwater permit trigger.
Who issues the grading/drainage permit?
The Site Plan Review Committee, which reviews the stormwater management, erosion control, and operation and maintenance plans under §§ 74-149 and 74-150.

Sources & Official References

Other rules in Fall River

All Fall River rules

Compare Fall River to another location·View the Massachusetts environmental rules overview

Get notified when Erosion Control in Fall River, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Bristol County handle erosion control.

New Bedford, MA
Light Restrictions
Taunton, MA
Some Restrictions