Taunton, MA Environmental Rules: Erosion Control (2026)
Key Facts
- Permit trigger
- 1+ acre of land disturbance
- Also triggers on
- smaller phases of larger common plans
- Administering agency
- Department of Public Works
- Required with permit
- erosion and sedimentation control plan
- Residential compliance grace period
- 180 days from effective date
Summary
Taunton requires a stormwater management permit before any construction activity disturbs an acre of land or more, or a smaller phase of a larger project that will eventually reach an acre. The permit must come with an erosion and sedimentation control plan, and skipping the plan's requirements is itself a violation of the City ordinances.
No person may undertake a construction activity, including clearing, grading and excavation, that results in a land disturbance that will disturb equal to or greater than one acre of land or will disturb less than one acre of land but is part of a larger common plan of development or sale that will ultimately disturb equal to or greater than one acre of land without a permit from the authorized enforcement agency or as otherwise provided in this article. ... Any person that fails to follow the requirements of a stormwater management permit and the related erosion and sedimentation control plan and operations and maintenance plan issued under the authorized enforcement agency regulations shall be in violation of the City of Taunton ordinances. ... Criteria for erosion and sediment control and post-construction stormwater management, including stormwater performance standards, shall be defined and included as part of the regulations promulgated under Article III, § 381-15, of this chapter.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4508986; v12 updated 2025-09-22; through 09-22-2025).
Full Breakdown
Article III of Chapter 381 governs stormwater management systems on private property and reaches any land-disturbing construction activity, including clearing, grading and excavation, once it crosses the one-acre threshold, whether that acre is disturbed at once or accumulates across a common plan of development or sale. A handful of activities are carved out: maintenance of existing lawns and gardens at a single-family home, fencing that will not alter drainage patterns, non-drainage utility work, ordinary farming, and land already regulated under a Conservation Commission order of conditions consistent with the state Stormwater Management Policy.
The Department of Public Works administers the permit program and, together with its rulemaking Committee, is directed to write the actual performance standards, meaning the specific erosion-control criteria, such as sediment fencing, stabilization timelines or slope limits, live in regulations adopted under Section 381-15 rather than spelled out in the ordinance text itself. What the ordinance itself makes clear is the consequence of noncompliance: failing to follow the permit, the erosion and sedimentation control plan, or the operations and maintenance plan tied to it is a violation of the City's ordinances, separate from any state Wetlands Protection Act review a wetland-adjacent site may also need.
Residential property owners were given a 180-day grace period from the article's 2014 effective date to come into compliance, provided they could show good cause for the delay.
Violations & Fines
Undertaking a one-acre-or-larger land disturbance without the required stormwater management permit, or ignoring the erosion and sedimentation control plan or operations and maintenance plan tied to an issued permit, is a violation of the City of Taunton ordinances. The Department of Public Works enforces Article III and can issue written remediation orders backed by civil and criminal remedies in court.
Frequently Asked Questions
When does a Taunton construction project need an erosion control plan?
Is a small residential project exempt from Taunton's erosion control rule?
Where are Taunton's actual erosion-control standards written?
What happens if a builder ignores the erosion control plan in a Taunton permit?
Sources & Official References
Other rules in Taunton
Compare Taunton to another location·View the Massachusetts environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Bristol County handle erosion control.