Grant County, WA Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- UDO § 23.12.080
- Technical standard
- Ecology Stormwater Manual for Eastern WA
- Enforcing office
- Grant County Engineer / Development Services
- Drainage report
- Sealed by a Professional Engineer when required
- Appeal
- County Engineer's drainage decision is final
Summary
Grant County requires all clearing, grading, and development to control erosion and stormwater under UDO § 23.12.080, tying county-level drainage and erosion-control work to the Washington Department of Ecology's Stormwater Management Manual for Eastern Washington.
23.12.080 - Clearing, Grading and Drainage Standards (a)Clearing and grading activities shall be conducted so as to minimize potential adverse effects on offsite property, surface water quality, and critical areas as delineated in GCC § 24.08.(b)Stormwater runoff from developments shall not adversely affect offsite property, surface water quality and quantity, and/or critical areas as delineated in GCC § 24.08. Provisions shall be made to control the release of surface water runoff from the development both during and following construction.(c)Clearing and grading, including drainage and erosion control measures, shall conform to the requirements of the Washington State Department of Ecology Stormwater Management Manual for Eastern Washington, or as specified by the County Engineer.(d)All development shall ensure that soil erosion and sedimentation of drainageways will be controlled to prevent damage to adjoining property and downstream drainage channels and receiving waters.
Full Breakdown
080, Clearing, Grading and Drainage Standards, governs erosion and sediment control on every development project in unincorporated Grant County. 08. Subsection (b) extends that duty to stormwater specifically: runoff from a development cannot adversely affect offsite property, surface water quality and quantity, or critical areas, and the developer must make provisions to control the release of surface water both during and after construction. Subsection (c) supplies the technical benchmark: clearing, grading, drainage, and erosion control measures must conform to the Washington State Department of Ecology's Stormwater Management Manual for Eastern Washington, or to whatever the County Engineer specifies instead, which functions as the county's working construction-site erosion standard even though the manual itself is a state document adopted by reference.
Subsection (d) adds a results-based duty, that soil erosion and sedimentation of drainageways be controlled so as to prevent damage to adjoining property and downstream drainage channels and receiving waters, and later subsections give the County Engineer authority to require a sealed drainage report from a professional engineer and to condition permit approval on meeting these controls, with the Engineer's approval or rejection of a drainage report final and not subject to administrative appeal.
Violations & Fines
A project that clears, grades, or discharges stormwater without the controls required by § 23.12.080, or that fails to submit a drainage report the County Engineer determines is necessary, can have its development permit conditioned, delayed, or denied by the County Engineer, whose decision on the adequacy of drainage controls under subsection (g) is final and not open to administrative appeal; ongoing offsite erosion damage is separately enforceable through Development Services code enforcement.
Frequently Asked Questions
What erosion-control standard applies to construction in unincorporated Grant County?
Who enforces stormwater and erosion rules on a Grant County project?
Can stormwater from my development run onto a neighbor's land?
Sources & Official References
Other rules in Grant County
Compare Grant County to another location·View the Washington environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.