Grant County, WA Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing standard
- WA DOE Stormwater Manual for Eastern WA
- Final authority
- County Engineer decision, not appealable
- Applies to
- All UDC development permits and plats
- Road discharge
- Prohibited onto county roads without approval
- Related section
- GCC § 22.04.370 (subdivision drainage)
Summary
In unincorporated Grant County, new development must control stormwater runoff so it does not harm neighboring land, water quality, or critical areas. Grant County Code section 23.12.080 requires clearing, grading, and drainage on regulated projects to follow the Washington State Department of Ecology's Stormwater Management Manual for Eastern Washington, with the County Engineer approving control measures.
(b)Stormwater runoff from developments shall not adversely affect offsite property, surface water quality and quantity, and/or critical areas as delineated in GCC § 24.08. Provisions shall be made to control the release of surface water runoff from the development both during and following construction.(c)Clearing and grading, including drainage and erosion control measures, shall conform to the requirements of the Washington State Department of Ecology Stormwater Management Manual for Eastern Washington, or as specified by the County Engineer. ... (e)Surface drainage shall not be directed to or discharged onto County Roads or ditches within County rights-of-way unless approved by the County Engineer.
Full Breakdown
080, Clearing, Grading and Drainage Standards, governs stormwater in the unincorporated county under the Unified Development Code's Title 23 zoning chapter. 08. The Code points builders to a specific outside standard rather than a home-grown one: erosion and drainage control on any construction site must conform to the Washington State Department of Ecology's Stormwater Management Manual for Eastern Washington, unless the County Engineer specifies otherwise for the site. Runoff cannot be discharged onto County roads or roadside ditches within county right-of-way without the County Engineer's approval, and the Engineer can require landscaping, re-established native vegetation, ponds, catch basins, or biofilters wherever downstream damage to property or water quality is likely.
When the County Engineer determines a project needs one, the applicant must submit a drainage report sealed by a professional engineer describing the proposed controls; the County Engineer's decision on the adequacy of that report and the stormwater measures is final and cannot be appealed administratively. 080 for the technical requirements. Any Decision Maker reviewing a development permit application may add clearing, grading and drainage conditions of approval to meet these standards, so stormwater compliance can be tightened project-by-project rather than left to one fixed number.
Violations & Fines
Development Services and the County Engineer review stormwater and drainage compliance as part of every UDC permit; the County Engineer's approval or rejection of a drainage report is final and not subject to administrative appeal. General UDC violations, including noncompliant clearing, grading or drainage work, are enforced under GCC Chapter 25.16, which authorizes notices of infraction, civil penalties, and compliance orders enforceable in Grant County courts.
Frequently Asked Questions
Which manual governs stormwater design in unincorporated Grant County?
Can I discharge stormwater into a county road ditch?
Who decides whether my drainage report is adequate, and can I appeal?
Sources & Official References
Other rules in Grant County
Compare Grant County to another location·View the Washington environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.