Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Plan required
Erosion and sediment control plan
When required
Before building or grading permit
Coverage period
Clearing through certificate of occupancy
Reviewing officials
Public works, planning, building & safety
BMP source
MS4 NPDES Permit Tables 7 and 8
Fees
Set by city council resolution

Summary

Hawthorne requires construction sites to deploy sediment barriers, silt fencing, tracking controls and slope erosion measures to keep runoff to the maximum extent practicable, and to submit an erosion and sediment control plan for city approval before any building or grading permit is issued.

A. Stormwater run-off containing sediment, construction materials or other pollutants from the construction site and any adjacent staging, storage or parking areas shall be reduced to the maximum extent practicable. ... 2. Structural controls such as sediment barriers, plastic sheeting, detention ponds, hydromulch, storm drain inlet protection, fiber rolls, chemical treatment, filters, berms, and similar controls shall be utilized to the maximum extent practicable in order to minimize the escape of sediment and other pollutants from the site. Wind erosion control such as silt fence and tracking control, such as entrance/exit stabilization or tire washing, must also be implemented when necessary. ... 7. Erosion from slopes and channels must be controlled through the effective combination of best management practices.

Full Breakdown

150 requires every construction project in the city, from land clearing or demolition through issuance of a certificate of occupancy, to apply best management practices drawn from Tables 7 and 8 of the MS4 NPDES permit so that stormwater runoff carrying sediment, construction materials or other pollutants from the site and adjacent staging, storage or parking areas is reduced to the maximum extent practicable. Required measures include structural controls such as sediment barriers, plastic sheeting, detention ponds, hydromulch, storm drain inlet protection, fiber rolls, chemical treatment, filters and berms, plus wind erosion controls like silt fencing and tracking controls such as entrance/exit stabilization or tire washing when needed.

Excavated soil must be located on site to minimize sediment reaching the street, drainage facilities or neighboring properties, with soil piles bermed or covered until used or hauled away. Washing construction vehicles or equipment on site is barred if wash water could run off the site into the municipal storm sewer, and trash receptacles must be kept from accumulating litter that migrates off site. 150(A)(7) separately requires that erosion from slopes and channels be controlled through an effective combination of best management practices. 160 requires the property owner to certify that these BMPs will be implemented, and requires the city manager, public works director, planning director or director of building and safety to require submission of an erosion and sediment control plan consistent with the MS4 NPDES permit for city review and approval. 150(A)(6) to recover program costs.

Violations & Fines

Failing to implement the required BMPs or erosion and sediment control plan is enforced as a Chapter 8.50 violation: it can be prosecuted as a misdemeanor under § 8.50.080, and the director of public works may issue a notice of violation or administrative order under § 8.50.090 requiring corrective action, with noncompliance treated as an additional violation and every violation independently declared an abatable public nuisance under § 8.50.100.

Frequently Asked Questions

Does Hawthorne require an erosion control plan before a grading permit?
Yes. Section 8.50.160 requires the owner to certify BMP compliance and requires an erosion and sediment control plan consistent with the MS4 NPDES permit, reviewed by the public works director, planning director or building and safety director before any grading or building permit is issued.
What erosion controls does Hawthorne require on construction sites?
Section 8.50.150 lists sediment barriers, plastic sheeting, detention ponds, hydromulch, storm drain inlet protection, fiber rolls, filters, berms, silt fencing and entrance/exit tracking controls, plus effective erosion control on slopes and channels, all to the maximum extent practicable.
Can I wash construction equipment on site in Hawthorne?
Not if the wash water could run off site into the municipal storm sewer system. Section 8.50.150(A)(4) bars washing construction or other vehicles adjacent to a site and bars any resulting runoff from entering the storm sewer.

Sources & Official References

Other rules in Hawthorne

All Hawthorne rules

California rules heatmap·Compare Hawthorne to another location·View the California environmental rules overview

Get notified when Erosion Control in Hawthorne, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Los Angeles County handle erosion control.

Carson, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Santa Monica, CA
Some Restrictions
South Gate, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Palmdale, CA
Some Restrictions