Irvington, NJ Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Standard
NJ Soil Conservation Service erosion/sediment device requirements
Approval authority
Municipal Engineer
Drainage rule
Runoff must not flood or erode neighboring land
Performance guaranty cap
Up to 120% of installation cost
Guaranty term
Up to three years
Default penalty
Up to $2,000 fine or 90 days jail

Summary

Irvington Township Code § 560-24 requires every construction project reviewed under Chapter 560 to install permanent or temporary soil erosion and sediment control devices that meet New Jersey Soil Conservation Service standards and win the Municipal Engineer's approval, while § 560-51 separately requires site plans to prevent runoff from flooding or eroding neighboring land.

Soil erosion and sediment control devices of a permanent or temporary nature shall be installed in accordance with the requirements of the New Jersey Soil Conservation Service and shall be subject to the approval of the Municipal Engineer. ... A. Surface runoff. Provisions shall be made for safe and adequate drainage of the surface runoff waters in and from the premises so that flooding and erosion of the property and the property of others will be prevented. Calculations on which the design of drainage facilities is based shall be submitted with the site plan.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4996945; v39 updated 2026-07-13; through 07-13-2026).

Full Breakdown

Chapter 560, Subdivision and Site Plan Review, was adopted by the Municipal Council on June 14, 1977, by Ord. No. A. , 'to promote the public health, safety, convenience, morals and general welfare' during any 'development,' a term the chapter defines broadly to cover subdividing land or constructing, reconstructing or altering any building or structure. Section 560-24 sits in Article X's design standards and requires that erosion and sediment control devices, whether permanent or temporary, meet the requirements of the New Jersey Soil Conservation Service and be approved by the Municipal Engineer before a subdivision or site plan can proceed.

Section 560-51 adds a companion drainage standard: an applicant must design 'safe and adequate drainage of the surface runoff waters in and from the premises' so that neither the applicant's property nor a neighbor's property floods or erodes, and must submit the engineering calculations behind that design with the site plan itself, not after approval. The chapter backs both standards with a financial guarantee: § 560-25 lets the Planning Board or Zoning Board of Adjustment require a performance guaranty covering, among other listed improvements, 'erosion control and sedimentation control devices,' in an amount up to 120% of installation cost and running for up to three years, so the Township can complete the work itself if a developer fails to.

Because Chapter 560 does not set its own separate penalty for an erosion-control violation the way it does for selling land before subdivision approval, an erosion or drainage violation falls back to the Revised Code's general penalty in § 1-17: a fine of up to $2,000, up to 90 days' imprisonment, or both, with each day of a continuing violation counted as a separate offense.

Violations & Fines

Failing to install or maintain the required soil erosion and sediment control devices, or building without the drainage design § 560-51 requires, is enforced through the Revised Code's general penalty at § 1-17: up to a $2,000 fine, up to 90 days' imprisonment, or both, with each day the violation continues charged as a separate offense. The Planning Board can also condition or withhold site plan approval until the standards are met.

Frequently Asked Questions

Does Irvington require erosion control during construction?
Yes. Section 560-24 of the Township Code requires any permanent or temporary soil erosion and sediment control devices used on a construction project to meet New Jersey Soil Conservation Service requirements and be approved by the Municipal Engineer before work proceeds under a subdivision or site plan approval.
What drainage design does a site plan need to show?
Section 560-51 requires the applicant to design safe, adequate drainage for surface runoff so that neither the property being developed nor a neighboring property floods or erodes, and to submit the engineering calculations behind that drainage design along with the site plan application itself.
What happens if a developer skips the erosion control requirement?
Chapter 560 has no standalone erosion-control fine, so a violation falls under the Revised Code's general penalty in § 1-17: up to a $2,000 fine, up to 90 days in jail, or both, with each additional day of noncompliance treated as its own separate offense.
Can the Township require a bond for erosion control work?
Yes. Section 560-25 lets the Planning Board or Zoning Board of Adjustment require a performance guaranty, up to 120% of the installation cost and running as long as three years, covering erosion control and sedimentation control devices among the other improvements a subdivision or site plan must install.

Sources & Official References

Other rules in Irvington

All Irvington rules

Compare Irvington to another location·View the New Jersey environmental rules overview

Get notified when Erosion Control in Irvington, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Essex County handle erosion control.

Newark, NJ
Some Restrictions