Jacksonville Beach, FL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Governing section
Jacksonville Beach Code § 32-106(c)(2)
Who is bound
Property owners, construction firms and contractors
Standard followed
All FDEP and SJRWMD runoff-control procedures
Inspections
City representative, with or without notice, on proper identification
Fix deadline
Set by the city based on degree of hazard
Penalty reference
Code § 1-11: up to $500 and/or 90 days, daily offense

Summary

In Jacksonville Beach, no property owner can let bare, uncontrolled earth wash soil and debris into any stormwater system, and every construction firm and contractor must follow the FDEP and SJRWMD procedures for construction site runoff control. The city inspects with or without notice, sets the correction deadline, and enforces through the general penalty in Code § 1-11.

(2) Erosion control/construction sites: No property owner shall allow through purpose or neglect, uncontrolled earthen exposure to deposit soil and related debris into any stormwater system. All construction firms and contractors must follow all FDEP and SJRWMD procedures and regulations as they pertain to construction site runoff control. ... (3) Compliance correction: Upon verbal or written notice, the owner of the property, site or facility shall correct any compliance violation. Correction shall be at a time interval to be determined by the city and based on the degree of hazard caused by the violation. (4) Penalties: Upon the determination of violation, all fines and penalties are applicable, which are currently associated with non-compliance under section 1-11 of the Code of Ordinances of the City of Jacksonville Beach.

View official code

Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 60).

Full Breakdown

The construction-site rule sits in the stormwater utility article of the utilities chapter, in Sec. 32-106(c)(2). It has two parts. The first binds the property owner: no owner shall allow, through purpose or neglect, uncontrolled earthen exposure to deposit soil and related debris into any stormwater system. Neglect counts, so an owner who leaves a graded lot bare and unprotected is covered even without intent. The second part binds construction firms and contractors, who must follow all FDEP and SJRWMD procedures and regulations as they pertain to construction site runoff control. The city does not write its own sediment standard in this section. It adopts the state and water management district procedures.

The purpose clause in Sec. 32-106(a) explains the target: reducing contaminants and pollutants reaching the stormwater system and its receiving waters, the Atlantic Ocean and the intra-coastal estuarial system. Under subsection (d), certain permitted discharges such as dechlorinated pool water and street cleaner water can enter the system only when the receiving system is suitably protected, and the protection named includes silt screens, hay bales and other approved erosion control methods.

Enforcement runs under Sec. 32-106(e). An authorized city representative, with or without notice and upon proper identification, can enter and inspect properties, sites and facilities, and can photograph or video tape infrastructure and activities. On a violation, the city gives verbal or written notice, and the owner must correct it within a time interval the city sets based on the degree of hazard caused. Penalties are the fines tied to non-compliance under Sec. 1-11.

The Land Development Code adds a construction-phase definition in Sec. 34-771. It describes erosion and sediment control measures as techniques and best practices implemented during construction of land improvements to prevent or minimize erosion and the transport of sediment into stormwater systems and surface waters, with silt fences, hay bales, sediment basins and floating turbidity curtains as examples. That section also requires erosion protection at the outlet of drainage structures, with an energy dissipation device where outlet velocities exceed three (3) feet per second.

Violations & Fines

Sec. 32-106(e)(4) points to the fines and penalties tied to non-compliance under Sec. 1-11 of the Jacksonville Beach Code. Sec. 1-11 sets a fine not exceeding five hundred dollars ($500.00) or imprisonment not exceeding ninety (90) days, or both, where no specific penalty is provided, and each day a violation continues is a separate offense. Any condition kept in violation is also deemed a public nuisance the city can abate.

Frequently Asked Questions

Does Jacksonville Beach have its own sediment control standard for building sites?
Sec. 32-106(c)(2) does not print a city-specific numeric standard. It requires all construction firms and contractors to follow all FDEP and SJRWMD procedures and regulations as they pertain to construction site runoff control, and it bars owners from letting uncontrolled earthen exposure deposit soil and debris into any stormwater system.
Can the city inspect my construction site without telling me first?
Yes. Sec. 32-106(e)(1) says an authorized representative of the city, with or without notice, upon proper identification, may enter and inspect all properties, sites and facilities for activities relating to proper stormwater management. Inspections can include photographing and video taping infrastructure and activities, and records of equipment and infrastructure maintenance must be made available.
How long do I have to fix an erosion violation?
The code does not print a fixed number of days. Under Sec. 32-106(e)(3), after verbal or written notice the owner of the property, site or facility must correct the violation within a time interval determined by the city and based on the degree of hazard the violation causes.
What counts as an erosion and sediment control measure?
Sec. 34-771 describes them as techniques and best practices implemented during construction of land improvements to prevent or minimize erosion and the transport of sediment into stormwater systems and surface waters. The printed examples are silt fences, hay bales, sediment basins and floating turbidity curtains.

Sources & Official References

Other rules in Jacksonville Beach

All Jacksonville Beach rules

Florida rules heatmap·Compare Jacksonville Beach to another location·View the Florida environmental rules overview

Get notified when Erosion Control in Jacksonville Beach, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in this county handle erosion control.

Jacksonville, FL
Some Restrictions