Jacksonville Beach, FL Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified November 2026

Key Facts

Governing section
Jacksonville Beach Code § 34-771
Approving department
Public works department; planning and development certifies
Major outfall design storm
Twenty-five-year, twenty-four-hour storm
Other development design storm
Ten-year, twenty-four-hour storm, ten-minute concentration
Water quality treatment volume
First one inch of rainfall over the entire site
Residential basin access
Minimum ten feet wide, in common area or easement

Summary

In Jacksonville Beach, section 34-771 of the Land Development Code bars anyone from subdividing land, changing contour lines, altering drainage or building a stormwater system without approval from the public works department. Development other than new residential subdivisions must handle a ten-year, twenty-four-hour storm, and the first one inch of rainfall over the whole site must be treated.

(b) Applicability. This division shall apply within the incorporated area of the City of Jacksonville Beach, Florida. A permit will be required for new stormwater discharge facilities or modifications to existing discharge facilities consistent with requirements defined by St. Johns River Water Management District (SJRWMD) as defined herein. ... 1. Major outfall facilities (trunk storm sewers, canals, waterways, natural drainage features and culverts of major outfalls) shall be designed and constructed to accommodate a twenty-five-year, twenty-four-hour frequency storm with a minimum time of concentration of zero minutes. ... 3. Stormwater management systems for development other than new residential subdivisions shall be designed and constructed to accommodate a ten-year, twenty-four-hour frequency storm, with a minimum time of concentration of ten (10) minutes. ... 5. Stormwater treatment shall be provided for a volume equivalent to either retention or detention with filtration, of the run-off from the first one (1) inch of rainfall over the area of the entire site pursuant to Chapter 62-25, Florida Administrative Code.

View official code

Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 60).

Full Breakdown

Section 34-771 applies inside the incorporated area of the City of Jacksonville Beach and requires a permit for new stormwater discharge facilities or changes to existing ones, consistent with St. Johns River Water Management District requirements. Activities that alter runoff patterns and need a permit before development starts include clearing or draining land, converting undeveloped land to nonagricultural use, subdividing land where road improvements are required, depositing fill, and any alteration that increases required capacity.

Design storms are fixed by the code. Major outfall facilities such as trunk storm sewers, canals and culverts must accommodate a twenty-five-year, twenty-four-hour storm with a zero-minute time of concentration. Major components in new residential subdivisions use the same twenty-five-year storm. Every other development must handle a ten-year, twenty-four-hour storm with a ten-minute time of concentration. Treatment is measured separately: the runoff from the first one inch of rainfall over the entire site, through retention or detention with filtration, and no discharge may cause a violation of water quality standards under Section 62-302.500 of the Florida Administrative Code.

The design must also meet the FDOT Drainage Manual, Chapter 62-25 F.A.C., Chapter 40C of the St. Johns River Water Management District rules, and the federal NPDES rules. Applications go to the planning and development department and must show one-foot contour intervals, soil types, drainage boundaries, pond sizes, an erosion and sedimentation control plan, soil borings at least ten feet below the proposed basin bottom, a maintenance plan, and a certification signed by a Florida-licensed engineer. The planning and development department certifies compliance after public works approves.

Construction details are specific. Dry basin bottoms are seeded and mulched, slopes steeper than 3:1 get stapled or pinned sod, wet pond banks steeper than 4:1 are stake sodded and fenced, and outlet velocities above three feet per second require an energy dissipation device. Residential drainage basins sit in common areas, not platted lots, with access at least ten feet wide.

A single-family residence and its accessory structures are exempt where clearing and drainage do not adversely impact adjacent properties by creating additional runoff. Land cleared solely for recreation, qualifying agriculture or open space is also exempt unless protected areas in the comprehensive plan could be affected.

Violations & Fines

Section 34-771 prints no separate fine or penalty schedule. It sets a gate and a remedy instead. No person may subdivide land, begin construction, change contour lines, alter drainage or build a stormwater management system without first meeting the division and obtaining public works department approval. Subsection (b) keeps the city's authority to require corrective action whenever a facility causes or contributes to violations of water quality and flood control standards. No connection to an off-site drainage system is allowed until its owner approves.

Frequently Asked Questions

Who approves a stormwater plan in Jacksonville Beach?
The public works department gives the approval required by section 34-771(c)(1). After that approval, the planning and development department certifies compliance with the division. The application form is set by planning and development, and a maintenance plan must go in with the construction plans for public works to approve.
Does a single-family home need a stormwater permit?
Section 34-771(d)(1) exempts construction, replacement, alteration or maintenance of a single-family residence and its accessory structures, but only where clearing and drainage do not adversely impact adjacent properties by creating additional runoff. If your work would push extra runoff onto a neighbor, the exemption does not apply.
What storm must a commercial site be designed for?
Stormwater systems for development other than new residential subdivisions must accommodate a ten-year, twenty-four-hour frequency storm, with a minimum time of concentration of ten minutes. Major outfalls are held to a twenty-five-year, twenty-four-hour storm, and treatment covers the runoff from the first one inch of rainfall over the entire site.
Can I improve a city drainage facility instead of storing water on my lot?
Yes, in the right cases. Section 34-771(e)(3) lets an applicant improve city stormwater management facilities in lieu of on-site storage, upon recommendation by the public works department and approval of the city council. The code points to areas where soil limitations or other constraints keep individual properties from meeting the on-site standards.

Sources & Official References

Other rules in Jacksonville Beach

All Jacksonville Beach rules

Florida rules heatmap·Compare Jacksonville Beach to another location·View the Florida environmental rules overview

Get notified when Stormwater Management in Jacksonville Beach, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in this county handle stormwater management.

Jacksonville, FL
Significant Restrictions