New Haven, CT Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Zoning Ordinance § 60
Plan trigger
0.5 acre disturbed or paved
Also triggers
3+ new residential units
Required content
pre/post runoff calculations

Summary

New Haven requires a stormwater management plan for zoning applications involving a half-acre or more of land disturbance, a half-acre of impervious cover, or three or more new residential units.

(c)Application requirements. A stormwater management plan shall be included as a part of any application for zoning approval (including but not limited to special permit and special exception), coastal site plan review, or an inland wetlands permit where:(1)The application pertains to a development or construction disturbing one-half or more acres of total land area on a site; or(2)The application pertains to any site with one-half acre or more of existing and/or proposed impervious cover; or(3)The application proposes new residential development of three or more units.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 31 | Zoning: Supplement 32).

Full Breakdown

New Haven Zoning Ordinance Section 60 requires a stormwater management plan as part of any zoning approval, special permit, coastal site plan review, or inland wetlands permit application where the project disturbs a half-acre or more of land, adds a half-acre or more of impervious cover, proposes three or more new residential units, or expands commercial/industrial impervious surface by more than 500 square feet. The plan must show pre- and post-development runoff rates, soil characteristics, and stormwater control measures, and the reviewing commission can refer it to the state DEP for a discharge-permit determination.

Violations & Fines

Applying for zoning or coastal-site-plan approval on a covered project without a stormwater management plan under Section 60 means the application is incomplete and cannot be approved.

Frequently Asked Questions

When does a New Haven project need a stormwater management plan?
When it disturbs a half-acre of land, adds a half-acre of impervious cover, builds 3+ housing units, or is in the coastal boundary. Section 60(c).
What must the plan show?
Soil data, nearby water bodies, proposed BMPs, and pre- and post-development runoff calculations, under Section 60(d).

Sources & Official References

Other rules in New Haven

All New Haven rules

Compare New Haven to another location·View the Connecticut environmental rules overview

Get notified when Erosion Control in New Haven, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.