Oregon, OH Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- Sec. 1177.06(d)-(f), Storm Sewers
- Trigger
- Any on-site storm water collection system
- Plan required
- Erosion Control Plan with site grading plans
- Approving official
- Director of Public Service
- State permit referenced
- Ohio EPA Permit No. OHC000002
- Penalty
- Misdemeanor, 2nd degree, per Sec. 501.99
- Adopted
- Ord. 014-2006, passed 3-13-06
Summary
In the City of Oregon, Ohio, Codified Ordinances Sec. 1177.06(d) requires every storm water collection system built during development to include sediment-removal treatment matching the city's Storm Water Management Plan, with the construction details captured on an Erosion Control Plan submitted with the site grading plans and approved by the Director of Public Service.
(d) All storm water collection systems shall be designed to include, but not be limited to, storm water treatment for the removal of sediment. The type of storm water treatment shall be in accordance to the applicable best management practice(s) (BMPs) as listed in the City's current SWMP. All construction and maintenance of storm water collection system shall be in accordance to the Ohio Environmental Protection Agency's Permit No.: OHC000002, or most current permit update. All construction details, involving storm water treatment and maintenance, shall be shown on the Erosion Control Plan for the site, which shall be submitted with the site grading plans subject to review and approval from the Director of Public Service. ... (f) Violation Beyond Time Limit; Penalty. Any person who continues any violation beyond the time limit provided for in subsection (d) hereof is guilty of a misdemeanor of the second degree and shall be punished as provided in Section 501.99 of the General Offenses Code.
Full Breakdown
06 sits in Chapter 1177, the improvement standards of the Subdivision Regulations, and its erosion-control duty is triggered on any site development bringing storm water collection systems online. Subsection (c) already requires on-site detention or retention for any project of one acre or more, sized to hold a 25-year post-developed storm while releasing no faster than the pre-developed 5-year rate. Subsection (d) builds on that by requiring the treatment component: storm water collection systems must remove sediment using the best management practices listed in the city's current Storm Water Management Plan, built and maintained under Ohio EPA Permit No.
OHC000002, the state's general construction storm water permit, or its current successor. Every construction detail covering that treatment and maintenance must appear on an Erosion Control Plan submitted with the site grading plans, which the Director of Public Service must review and approve before work proceeds. Once built, post-construction structural BMPs are not a one-time obligation: the developer or property owner must maintain them to the BMP's own maintenance requirements, and the Department of Public Service inventories and inspects them going forward. A property found out of compliance under subsection (d) gets a written notice by first-class mail, sent to the address on the Lucas County tax or water-account records, setting a deadline to correct the violation; if the violator misses that deadline, subsection (f) converts the failure into a misdemeanor of the second degree, punished under Sec.
99 of the General Offenses Code. The whole framework was adopted by Ordinance 014-2006, passed March 13, 2006, and is enforced administratively through the same site-plan review the city requires for zoning approval under Sec. 02.
Violations & Fines
A property or developer that fails to maintain a required storm water BMP under Sec. 1177.06(d) receives written notice by first-class mail setting a deadline to correct the problem. Missing that deadline converts the failure into a misdemeanor of the second degree under Sec. 1177.06(f), punished as provided in Sec. 501.99 of the General Offenses Code, on top of any separate zoning or building-permit consequences for uncorrected site work.
Frequently Asked Questions
Does Oregon, Ohio require an erosion control plan for new development?
What state permit does the erosion control rule reference?
Who checks that erosion control measures keep working after construction?
What happens if I miss the deadline in my erosion-control violation notice?
Sources & Official References
Other rules in Oregon
Compare Oregon to another location·View the Ohio environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Lucas County handle erosion control.