Pacifica, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
PMC § 6-12.206
Applies to
All construction and development activity
Required tools
Silt fences, fiber rolls, check dams
Financial security
Letter of credit, cash deposit or bond
Stop-work authority
Enforcement official, written notice

Summary

Anyone doing construction or development work in the City of Pacifica must install best management practices, or BMPs, that keep construction waste, stockpiled soil and other contaminants out of the storm water system and watercourses. Erosion and sediment controls such as silt fences, fiber rolls, check dams and construction entrance controls are required under the stormwater ordinance, and the City can stop work that fails to comply.

Any person performing construction activities or development in the City shall implement appropriate BMPs to prevent the discharge of construction wastes or contaminants from construction materials, tools and equipment, stockpiles, or exposed soil from entering the City storm water system or watercourse. ... Construction-phase BMPs include erosion and sediment controls and pollution prevention practices. Erosion control BMPs may include, but are not limited to, scheduling and timing of grading activities, timely revegetation of graded areas, the use of hydroseed and hydraulic mulches, and installation or application of soil binders, straw mulch, wood mulch, fiber rolls, check dams, and erosion control blankets. Sediment control may include properly sized detention basins, dams, or filters to reduce entry of suspended sediment into the storm water system and watercourses, installation of silt fences, fiber rolls, check dams, or gravel bags, and installation of construction entrance controls to prevent tracking of sediment onto adjacent streets.

Full Breakdown

206 requires anyone performing construction activity or development in the City to implement appropriate best management practices, or BMPs, to keep construction wastes, tools, equipment, stockpiles, and exposed soil from entering the City storm water system or a watercourse. All construction plans and permit applications submitted to the City must show how they'll implement those BMPs. The ordinance describes construction-phase BMPs as covering both erosion control and sediment control. Erosion control measures include scheduling and timing grading activities, promptly revegetating graded areas, and using hydroseed, hydraulic mulch, soil binders, straw or wood mulch, fiber rolls, check dams, and erosion control blankets.

Sediment control measures include properly sized detention basins, dams or filters to keep suspended sediment out of the storm system, silt fences, fiber rolls, check dams or gravel bags, and construction entrance controls to stop sediment from tracking onto adjacent streets. Pollution prevention practices required alongside these controls include designated washout areas, control of trash and recycled materials, tarping stored materials, and proper maintenance of temporary sanitary facilities. The City may require financial security, an irrevocable letter of credit, cash deposit, or performance bond, to guarantee that temporary storm water controls are installed and maintained during and after construction.

When work is being done contrary to the chapter, including a failure to properly install or maintain BMPs, the enforcement official can order the work stopped by written notice, and work must remain stopped until the official authorizes it to resume.

Violations & Fines

Failing to install or maintain required BMPs lets the enforcement official issue a written stop-work order under Section 6-12.206(b)(3), and work must halt until the City authorizes it to resume. Because the erosion-control duty sits inside the storm water chapter, noncompliance also exposes a contractor or property owner to the chapter's misdemeanor charge and administrative citations of $250 to $1,000 per violation under Section 6-12.303.

Frequently Asked Questions

Does every construction project in Pacifica need erosion controls?
Yes. Section 6-12.206(a) applies to any person performing construction activities or development in the City, requiring BMPs that prevent construction wastes, stockpiles or exposed soil from reaching the storm water system, and building permit applications must show how those BMPs will be implemented.
Can the City require a bond for erosion control?
Yes. Section 6-12.206(b)(2) lets the City require financial security, an irrevocable letter of credit, cash deposit or performance bond, to ensure temporary storm water pollution controls are installed and kept in place during construction and for a period afterward that the City determines.
What happens if BMPs aren't maintained on a job site?
The enforcement official can order the work stopped in writing under Section 6-12.206(b)(3) whenever work is being done contrary to the chapter, including a failure to properly install or maintain BMPs, and work must stay stopped until the official authorizes it to proceed again.

Sources & Official References

Other rules in Pacifica

All Pacifica rules

California rules heatmap·Compare Pacifica to another location·View the California environmental rules overview

Get notified when Erosion Control in Pacifica, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.